Mahdi Safa, Kelly Weeks, Ashraf F. Elhoubi, Nomita Sharma, Sandra MacGillivray
{"title":"Construction Strategic Project Readiness Assessment","authors":"Mahdi Safa, Kelly Weeks, Ashraf F. Elhoubi, Nomita Sharma, Sandra MacGillivray","doi":"10.32738/jeppm-2022-0002","DOIUrl":null,"url":null,"abstract":"Proper use of construction strategic management consists of strategic planning for controlling the implementation of strategies during front-end planning (FEP). To improve FEP effort, industry best practice instrument, i.e., Project Definition Rating Index (PDRI) has been used to ensure continued alignment and focus on strategic project priorities. This study proposes a methodology for creating a SWOT (strengths, weaknesses, opportunities, and threats) analysis of big post-mining data from organizations that have implemented PDRI, as a standardized tool used across capital project portfolios. The results show that the proposed methodology has the potential to improve project success when applied as a benchmark of baseline conditions, the element level.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 1
Abstract
Proper use of construction strategic management consists of strategic planning for controlling the implementation of strategies during front-end planning (FEP). To improve FEP effort, industry best practice instrument, i.e., Project Definition Rating Index (PDRI) has been used to ensure continued alignment and focus on strategic project priorities. This study proposes a methodology for creating a SWOT (strengths, weaknesses, opportunities, and threats) analysis of big post-mining data from organizations that have implemented PDRI, as a standardized tool used across capital project portfolios. The results show that the proposed methodology has the potential to improve project success when applied as a benchmark of baseline conditions, the element level.