Distribution Transformer Synchronization Simulation with Two Different Vector Groups using the Matlab Simulink

Brainvendra Widi Dionova, Taopik Hidayat, Sinka Wilyanti, M. N. Mohammed
{"title":"Distribution Transformer Synchronization Simulation with Two Different Vector Groups using the Matlab Simulink","authors":"Brainvendra Widi Dionova, Taopik Hidayat, Sinka Wilyanti, M. N. Mohammed","doi":"10.25077/jnte.v11n3.1041.2022","DOIUrl":null,"url":null,"abstract":"Nowadays, the quality of electrical energy really needs to be improved especially for industrial purposes that require a good level of reliability in the distribution of electrical energy. Maintenance of distribution transformers is routinely carried out to ensure that the quality of electrical energy produced is in accordance with standards. This maintenance is done using the customer’s load from the distribution transformer to the mobile substation transformer, that can be done using synchronization. This synchronization requires the same distribution transformer vector groups, otherwise it will produce non-standard output. The aim of this research is to determine the vector groups effect on parallel transformer installation system, the method to overcome the synchronous problem of different vector groups based on simulating and testing the synchronization of a 20 / 0.4 kV distribution transformer with the Dyn5 and Dyn11 vector groups. The results obtained from this research are two transformers that have different vector groups can be synchronized with an abnormal connection (changing the position of the secondary terminal cable connection and the primary terminal cable) so that it will produce the same voltage phase. This will abnormal treatment of distribution transformers maintenance that do not have a back-up transformer with the same vector group still can use the different vector group transformers.","PeriodicalId":30660,"journal":{"name":"Jurnal Nasional Teknik Elektro","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Nasional Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/jnte.v11n3.1041.2022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Nowadays, the quality of electrical energy really needs to be improved especially for industrial purposes that require a good level of reliability in the distribution of electrical energy. Maintenance of distribution transformers is routinely carried out to ensure that the quality of electrical energy produced is in accordance with standards. This maintenance is done using the customer’s load from the distribution transformer to the mobile substation transformer, that can be done using synchronization. This synchronization requires the same distribution transformer vector groups, otherwise it will produce non-standard output. The aim of this research is to determine the vector groups effect on parallel transformer installation system, the method to overcome the synchronous problem of different vector groups based on simulating and testing the synchronization of a 20 / 0.4 kV distribution transformer with the Dyn5 and Dyn11 vector groups. The results obtained from this research are two transformers that have different vector groups can be synchronized with an abnormal connection (changing the position of the secondary terminal cable connection and the primary terminal cable) so that it will produce the same voltage phase. This will abnormal treatment of distribution transformers maintenance that do not have a back-up transformer with the same vector group still can use the different vector group transformers.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于Matlab Simulink的两种不同矢量组的配电变压器同步仿真
如今,电能的质量确实需要提高,特别是对于要求电能分配具有良好可靠性的工业目的。配电变压器定期进行维护,以确保产生的电能质量符合标准。这种维护是使用从配电变压器到移动变电站变压器的客户负载来完成的,可以使用同步来完成。这种同步需要相同的配电变压器矢量组,否则会产生非标准输出。本研究的目的是在模拟和测试20/0.4kV配电变压器与Dyn5和Dyn11矢量组同步的基础上,确定矢量组对并联变压器安装系统的影响,以及克服不同矢量组同步问题的方法。从这项研究中获得的结果是,具有不同矢量组的两个变压器可以与异常连接同步(改变二次端子电缆连接和一次端子电缆的位置),从而产生相同的电压相位。这将异常处理配电变压器的维护,没有备用变压器的同一矢量组仍然可以使用不同的矢量组变压器。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
20
期刊最新文献
Development of DC Motor Speed Control Using PID Based on Arduino and Matlab For Laboratory Trainer IoT-Based Disaster Response Robot for Victim Identification in Building Collapses Techno-Economic Analysis for Raja Ampat Off-Grid System Comparative Analysis of Two-Stage and Single-Stage Models in Batteryless PV Systems for Motor Power Supply Enhanced Identification of Valvular Heart Diseases through Selective Phonocardiogram Features Driven by Convolutional Neural Networks (SFD-CNN)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1