Agent-Based Simulation Modeling for the Evaluation and Dynamic Adjustment of Project Benefits in Urban Rail Transit PPPs

IF 5.3 1区 工程技术 Q1 ENGINEERING, CIVIL Journal of Management in Engineering Pub Date : 2023-03-01 DOI:10.1061/jmenea.meeng-4682
Wei Li, Jingfeng Yuan, Guodong Zhang, Shaolin Wei, Binggen Zhang, M. Skibniewski
{"title":"Agent-Based Simulation Modeling for the Evaluation and Dynamic Adjustment of Project Benefits in Urban Rail Transit PPPs","authors":"Wei Li, Jingfeng Yuan, Guodong Zhang, Shaolin Wei, Binggen Zhang, M. Skibniewski","doi":"10.1061/jmenea.meeng-4682","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":50155,"journal":{"name":"Journal of Management in Engineering","volume":" ","pages":""},"PeriodicalIF":5.3000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Management in Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1061/jmenea.meeng-4682","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于Agent的城市轨道交通PPP项目效益评价与动态调整仿真模型
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Management in Engineering
Journal of Management in Engineering 工程技术-工程:工业
CiteScore
12.60
自引率
23.00%
发文量
124
审稿时长
2.3 months
期刊介绍: The Journal of Management in Engineering offers an avenue for researchers and practitioners to present contemporary issues associated with management and leadership for the civil engineer. The journal publishes peer-reviewed papers, case studies, technical notes, and discussions of interest to the practice of civil engineering.
期刊最新文献
Deconstruction of ESG Impacts on US Corporate Bond Pricing: The Cost of Capital Benefits Across Industry Sectors Effect of Implementing Sustainable Management Practices on Construction Claim Mitigation Contagion of BIM Implementation Practices in Interproject Networks: An Empirical Study in China Exploring Online Perceptions of Justice in Large-Scale Infrastructure Projects: Temporal Patterns, Sentiment Characteristics, and Topic Changes Investigating the Relationship of the Integrity Climate of a Public Organization with Corruption in Construction Projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1