{"title":"Single-Machine Scheduling with a Deteriorating Maintenance Activity and DeJong’s Learning Effect","authors":"Jie Gao, Juan Zou, Yuzhong Zhang","doi":"10.1142/s0129054122460030","DOIUrl":null,"url":null,"abstract":"In this paper, we study the single-machine scheduling problems with DeJong’s learning effect and deteriorating maintenance activity, where DeJong’s learning effect is a special position-based learning effect and the duration of the deteriorating maintenance activity is a linear increasing function of its starting time. Our goal is to determine the job sequence of all jobs and the position of the maintenance activity to minimize some performance measures. When the performance measures are the makespan and the total completion time, we show that both of them can be solved in polynomial time. When the performance measure is the total weighted completion time, we develop a pseudo-polynomial time dynamic programming algorithm under a special case. When the performance measure is the maximum lateness, we show that the earliest due date first (EDD) order is a bad algorithm for the general case, and develop a polynomial time algorithm under a special case.","PeriodicalId":50323,"journal":{"name":"International Journal of Foundations of Computer Science","volume":null,"pages":null},"PeriodicalIF":0.6000,"publicationDate":"2022-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Foundations of Computer Science","FirstCategoryId":"94","ListUrlMain":"https://doi.org/10.1142/s0129054122460030","RegionNum":4,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"COMPUTER SCIENCE, THEORY & METHODS","Score":null,"Total":0}
引用次数: 0
Abstract
In this paper, we study the single-machine scheduling problems with DeJong’s learning effect and deteriorating maintenance activity, where DeJong’s learning effect is a special position-based learning effect and the duration of the deteriorating maintenance activity is a linear increasing function of its starting time. Our goal is to determine the job sequence of all jobs and the position of the maintenance activity to minimize some performance measures. When the performance measures are the makespan and the total completion time, we show that both of them can be solved in polynomial time. When the performance measure is the total weighted completion time, we develop a pseudo-polynomial time dynamic programming algorithm under a special case. When the performance measure is the maximum lateness, we show that the earliest due date first (EDD) order is a bad algorithm for the general case, and develop a polynomial time algorithm under a special case.
期刊介绍:
The International Journal of Foundations of Computer Science is a bimonthly journal that publishes articles which contribute new theoretical results in all areas of the foundations of computer science. The theoretical and mathematical aspects covered include:
- Algebraic theory of computing and formal systems
- Algorithm and system implementation issues
- Approximation, probabilistic, and randomized algorithms
- Automata and formal languages
- Automated deduction
- Combinatorics and graph theory
- Complexity theory
- Computational biology and bioinformatics
- Cryptography
- Database theory
- Data structures
- Design and analysis of algorithms
- DNA computing
- Foundations of computer security
- Foundations of high-performance computing