Unpacking the framework of unsolicited proposal for public private partnership projects – the Indian case

Varaprasad Mallisetti, T. Dolla, B. Laishram
{"title":"Unpacking the framework of unsolicited proposal for public private partnership projects – the Indian case","authors":"Varaprasad Mallisetti, T. Dolla, B. Laishram","doi":"10.1108/jfmpc-04-2020-0021","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe most recent advent of the unsolicited proposal in the public private partnership mode of infrastructure procurement has changed the duties and roles of private and public sector agencies. Also, they have increased the practitioners' difficulties to work out strategic mechanisms and methods to manage these unsolicited proposals (USP) effectively. So, this study aims to understand how well equipped are the Indian USP guidelines for managing procurement.\n\n\nDesign/methodology/approach\nContent analysis with coding procedures was carried to understand the regulations of USP frameworks of India over the four stages of USP procurement.\n\n\nFindings\nThe findings show that there are severe flaws in various states' frameworks. The states have flaws in their policies in implementation features across the stages of USP such as defined objectives, the absence of fees and review timeframes in the submission, time frame and guidance on benchmarking and market testing in evaluation and development, time frame for bidding and access to information in procurement stages.\n\n\nOriginality/value\nThe USP implementation framework developed as part of this study can direct the policymakers and practitioners to improve public procurement regulations and the necessary changes for the successful implementation of USPs. In doing this, the private sector is enabled to develop more competitive and innovative proposals.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-11-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-04-2020-0021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

Abstract

Purpose The most recent advent of the unsolicited proposal in the public private partnership mode of infrastructure procurement has changed the duties and roles of private and public sector agencies. Also, they have increased the practitioners' difficulties to work out strategic mechanisms and methods to manage these unsolicited proposals (USP) effectively. So, this study aims to understand how well equipped are the Indian USP guidelines for managing procurement. Design/methodology/approach Content analysis with coding procedures was carried to understand the regulations of USP frameworks of India over the four stages of USP procurement. Findings The findings show that there are severe flaws in various states' frameworks. The states have flaws in their policies in implementation features across the stages of USP such as defined objectives, the absence of fees and review timeframes in the submission, time frame and guidance on benchmarking and market testing in evaluation and development, time frame for bidding and access to information in procurement stages. Originality/value The USP implementation framework developed as part of this study can direct the policymakers and practitioners to improve public procurement regulations and the necessary changes for the successful implementation of USPs. In doing this, the private sector is enabled to develop more competitive and innovative proposals.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
拆解公私合作项目主动提案的框架——印度案例
目的最近出现的公私合作基础设施采购模式中的主动提案改变了私营和公共部门机构的职责和作用。此外,它们增加了从业者制定有效管理这些主动提案(USP)的战略机制和方法的困难。因此,本研究旨在了解印度USP采购管理指南的适用性。设计/方法/方法采用编码程序进行内容分析,以了解印度USP框架在USP采购的四个阶段的规定。调查结果表明,各州的框架存在严重缺陷。各州在USP各阶段的实施特征方面的政策存在缺陷,如明确的目标、提交中没有费用和审查时间表、评估和开发中基准和市场测试的时间表和指导、招标的时间表以及采购阶段的信息获取。独创性/价值作为本研究的一部分制定的USP实施框架可以指导政策制定者和从业者改进公共采购法规和成功实施USP的必要变革。通过这样做,私营部门能够制定更具竞争力和创新性的提案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1