Transport equity considerations of a ‘Trackless Tram-Entrepreneur Rail Model’

IF 1.5 Q2 Social Sciences Australian Planner Pub Date : 2020-10-02 DOI:10.1080/07293682.2020.1854799
I. Lawrie
{"title":"Transport equity considerations of a ‘Trackless Tram-Entrepreneur Rail Model’","authors":"I. Lawrie","doi":"10.1080/07293682.2020.1854799","DOIUrl":null,"url":null,"abstract":"ABSTRACT New ‘trackless tram’ technology offers potential for cheaper deployment of high-quality public transport. This paper discusses planning and equity challenges inherent in Newman et al. (2018)’s Trackless Tram Entrepreneur Rail Model (TT-ERM) where public transport is delivered by the private sector, paid for by the profits of closely aligned real estate development. Although the concept offers potentially positive urban outcomes, an uneasy co-existence between private, integrated transport and land use development adjacent to legacy urban form likely limits viability of the model. Referencing past urban experiences, solutions are offered which maximise the positive opportunity of trackless trams for Australian cities.","PeriodicalId":45599,"journal":{"name":"Australian Planner","volume":"56 1","pages":"270 - 277"},"PeriodicalIF":1.5000,"publicationDate":"2020-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/07293682.2020.1854799","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian Planner","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/07293682.2020.1854799","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 2

Abstract

ABSTRACT New ‘trackless tram’ technology offers potential for cheaper deployment of high-quality public transport. This paper discusses planning and equity challenges inherent in Newman et al. (2018)’s Trackless Tram Entrepreneur Rail Model (TT-ERM) where public transport is delivered by the private sector, paid for by the profits of closely aligned real estate development. Although the concept offers potentially positive urban outcomes, an uneasy co-existence between private, integrated transport and land use development adjacent to legacy urban form likely limits viability of the model. Referencing past urban experiences, solutions are offered which maximise the positive opportunity of trackless trams for Australian cities.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
“无轨电车企业家轨道模式”的运输公平考虑
新的“无轨电车”技术为低成本部署高质量的公共交通提供了潜力。本文讨论了Newman等人(2018)的无轨电车企业家轨道模型(TT-ERM)中固有的规划和公平挑战,其中公共交通由私营部门提供,由紧密结合的房地产开发的利润支付。尽管这个概念提供了潜在的积极的城市结果,但私人综合交通和土地利用开发之间的不稳定共存可能限制了该模型的可行性。参考过去的城市经验,提供解决方案,最大限度地发挥无轨电车对澳大利亚城市的积极作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Australian Planner
Australian Planner REGIONAL & URBAN PLANNING-
CiteScore
2.40
自引率
0.00%
发文量
12
期刊最新文献
The impact of the COVID-19 pandemic on the music industries of Brisbane and an evaluation of the policy response Planning for open space and recreation in new high density areas: a reply to Marriott Practice reflections on the pandemic from South East Queensland Planning with foresight and resilience: the Planning Institute of Australia National Congress in Adelaide 2023 How have South Australian urban planning policies affected Blakeview’s surface temperatures?
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1