Elton Reservoir Slip

Q4 Earth and Planetary Sciences Dams and Reservoirs Pub Date : 2022-07-20 DOI:10.1680/jdare.22.00088
M. Coombs, Nathan Povey, David H. Brown
{"title":"Elton Reservoir Slip","authors":"M. Coombs, Nathan Povey, David H. Brown","doi":"10.1680/jdare.22.00088","DOIUrl":null,"url":null,"abstract":"Elton Reservoir was built between 1804 and 1808 to supply water to the Manchester, Bolton and Bury Canal. The canal is no longer open for boat traffic, but the reservoir does provide a sweetening flow. The reservoir is retained by a 600m long embankment dam with a maximum height of 8.8 metres, has a capacity of 923,000 m3 and a surface area of 22 hectares. Top Water Level in the reservoir is 87.70 m AOD. The Canal & River Trust (the Trust) is the reservoir owner. The reservoir has experienced a number of embankment slips in the past with the most recent being in 2012. The water level was subsequently reduced until repair works could be undertaken. A length of unlined spillway channel along the toe of the embankment suffering from erosion was repaired at the same time. The opportunity was taken to complete other remedial works including making the operation of the scour valve within the confined space of the outlet tunnel less onerous. This paper outlines the investigation works undertaken and the various options considered with respect to repairing the slip and providing embankment stabilisation, which led to the preferred solution of counterfort drains.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00088","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Elton Reservoir was built between 1804 and 1808 to supply water to the Manchester, Bolton and Bury Canal. The canal is no longer open for boat traffic, but the reservoir does provide a sweetening flow. The reservoir is retained by a 600m long embankment dam with a maximum height of 8.8 metres, has a capacity of 923,000 m3 and a surface area of 22 hectares. Top Water Level in the reservoir is 87.70 m AOD. The Canal & River Trust (the Trust) is the reservoir owner. The reservoir has experienced a number of embankment slips in the past with the most recent being in 2012. The water level was subsequently reduced until repair works could be undertaken. A length of unlined spillway channel along the toe of the embankment suffering from erosion was repaired at the same time. The opportunity was taken to complete other remedial works including making the operation of the scour valve within the confined space of the outlet tunnel less onerous. This paper outlines the investigation works undertaken and the various options considered with respect to repairing the slip and providing embankment stabilisation, which led to the preferred solution of counterfort drains.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
埃尔顿水库滑脱
埃尔顿水库建于1804年至1808年间,为曼彻斯特、博尔顿和伯里运河供水。运河不再对船只开放,但水库确实提供了一种甜味流。该水库由一座600米长、最大高度8.8米、库容923000立方米、表面积22公顷的堤坝拦挡。水库最高水位为87.70 m AOD。运河与河流信托(以下简称“信托”)是水库所有者。该水库过去曾经历过多次堤防滑坡,最近一次是在2012年。水位随后降低,直到可以进行修复工程。同时修复了沿堤脚遭受侵蚀的一段无衬砌溢洪道。借此机会完成了其他补救工程,包括减少出口隧洞密闭空间内冲刷阀的操作。本文概述了所进行的调查工作以及在修复滑坡和提供路堤稳定方面所考虑的各种方案,这导致了扶壁排水沟的首选解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
期刊最新文献
Leeds FAS2 FSR: environmental challenges for the design of an in-river control structure Simulating a reservoir on-site flood plan test: Operation Redbrook Dunside reservoirs discontinuance – taking a new approach Undertaking RARS assessments for Hong Kong reservoirs Assessment the stability of earth dams based on construction pace by fuzzy inference logic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1