Factors influencing the adoption of public–private partnership in low-cost housing development in Myanmar

B. Hadikusumo
{"title":"Factors influencing the adoption of public–private partnership in low-cost housing development in Myanmar","authors":"B. Hadikusumo","doi":"10.1108/JFMPC-01-2020-0003","DOIUrl":null,"url":null,"abstract":"\nPurpose\nTo provide low-cost housing, the Myanmar Government is attempting to use public–private partnership (PPP) to attract private investors. However, there is little information concerning the influencing factors for implementing PPP low-cost housing projects in Myanmar. This paper, therefore, aims to identify and analyse these factors.\n\n\nDesign/methodology/approach\nA total of 51 in-depth interviews were conducted with interviewees involved in various kinds of housing projects implemented through the adoption of PPP or other approaches. The methods of data collection and the analysis are based on grounded theory (GT) methodology.\n\n\nFindings\nUsing the GT method to analyse the interviews, five categories emerged from 50 influencing factors regarding the establishment and implementation of the PPP model for low-cost housing in Myanmar: provision of incentives; obstacles in implementing PPP for all stakeholders; barriers to private sector participation; public sector responsibilities and challenges; and attraction factors and challenges for financial institutions. Among 12 newly found factors, the three most important for PPP low-cost housing in Myanmar are the availability of project funding, the resolution of land-acquisition issues and the development of a sound financing system.\n\n\nResearch limitations/implications\nOur findings strengthen previous studies by identifying factors affecting PPP low-cost housing either specific to Myanmar or common among other countries. Of the 50 factors identified, 38 factors were found in previous studies, but 12 are likely specific to Myanmar.\n\n\nPractical implications\nOur findings can be used by governments, particularly the Myanmar Government, and financial agencies to understand the low attractiveness of PPP low-cost housing for investors and to develop/improve policies to stimulate PPP low-cost housing, especially in Myanmar.\n\n\nOriginality/value\nMany previous studies have been undertaken to identify factors that influence the implementation of PPP for low-cost housing. However, to the best of the authors’ knowledge, there are no prior studies specific to Myanmar in this context.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-02-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-01-2020-0003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 2

Abstract

Purpose To provide low-cost housing, the Myanmar Government is attempting to use public–private partnership (PPP) to attract private investors. However, there is little information concerning the influencing factors for implementing PPP low-cost housing projects in Myanmar. This paper, therefore, aims to identify and analyse these factors. Design/methodology/approach A total of 51 in-depth interviews were conducted with interviewees involved in various kinds of housing projects implemented through the adoption of PPP or other approaches. The methods of data collection and the analysis are based on grounded theory (GT) methodology. Findings Using the GT method to analyse the interviews, five categories emerged from 50 influencing factors regarding the establishment and implementation of the PPP model for low-cost housing in Myanmar: provision of incentives; obstacles in implementing PPP for all stakeholders; barriers to private sector participation; public sector responsibilities and challenges; and attraction factors and challenges for financial institutions. Among 12 newly found factors, the three most important for PPP low-cost housing in Myanmar are the availability of project funding, the resolution of land-acquisition issues and the development of a sound financing system. Research limitations/implications Our findings strengthen previous studies by identifying factors affecting PPP low-cost housing either specific to Myanmar or common among other countries. Of the 50 factors identified, 38 factors were found in previous studies, but 12 are likely specific to Myanmar. Practical implications Our findings can be used by governments, particularly the Myanmar Government, and financial agencies to understand the low attractiveness of PPP low-cost housing for investors and to develop/improve policies to stimulate PPP low-cost housing, especially in Myanmar. Originality/value Many previous studies have been undertaken to identify factors that influence the implementation of PPP for low-cost housing. However, to the best of the authors’ knowledge, there are no prior studies specific to Myanmar in this context.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
影响缅甸在低成本住房开发中采用公私合作伙伴关系的因素
目的为了提供低成本住房,缅甸政府正试图利用公私合作来吸引私人投资者。然而,关于在缅甸实施PPP低成本住房项目的影响因素的信息很少。因此,本文旨在识别和分析这些因素。设计/方法/方法共对参与通过PPP或其他方法实施的各种住房项目的受访者进行了51次深入访谈。数据收集和分析的方法基于扎根理论(GT)方法论。调查结果使用GT方法分析访谈,从50个影响缅甸低成本住房PPP模式建立和实施的因素中得出五类:激励措施的提供;为所有利益攸关方实施PPP的障碍;私营部门参与的障碍;公共部门的责任和挑战;金融机构的吸引力因素和挑战。在12个新发现的因素中,缅甸PPP低成本住房最重要的三个因素是项目资金的可用性、土地征用问题的解决以及健全的融资体系的发展。研究局限性/含义我们的研究结果通过确定影响购买力平价低成本住房的因素来加强先前的研究,这些因素是缅甸特有的或在其他国家中常见的。在确定的50个因素中,在以前的研究中发现了38个因素,但有12个可能是缅甸特有的。我们的研究结果可供政府,特别是缅甸政府和金融机构使用,以了解PPP低成本住房对投资者的低吸引力,并制定/改进刺激PPP低成本住宅的政策,特别是在缅甸。原始性/价值许多以前的研究都是为了确定影响低成本住房PPP实施的因素。然而,据作者所知,此前没有针对缅甸的这方面的研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1