A data-driven model with minimal information for bottleneck detection - application at Bosch thermotechnology

IF 3 Q2 OPERATIONS RESEARCH & MANAGEMENT SCIENCE International Journal of Management Science and Engineering Management Pub Date : 2022-10-11 DOI:10.1080/17509653.2022.2116121
Â. F. Brochado, E. M. Rocha, D. Almeida, A. de Sousa, A. Moura
{"title":"A data-driven model with minimal information for bottleneck detection - application at Bosch thermotechnology","authors":"Â. F. Brochado, E. M. Rocha, D. Almeida, A. de Sousa, A. Moura","doi":"10.1080/17509653.2022.2116121","DOIUrl":null,"url":null,"abstract":"ABSTRACT In the context of bottleneck detection, most data-driven approaches employ data from diverse production variables (machine processing times, machine state tags, input timestamps, etc.) for a detailed analysis of bottlenecks. However, for manufacturing companies initiating their digitalization process (i.e. requiring the smallest hardware investment), a bottom-top approach is still missing. In this work, a data-driven model based on minimal information (MI) retrieved from a manufacturing execution system is proposed for bottleneck detection. We consider MI timestamps when each product exits each station and show that this is the most elementary information from production-line operations, enough to autonomously generate an abstract manufacturing layout, and to detect and predict bottlenecks. A general abstract model of a production line is proposed, named queue directed graph (QDG). Incorporating the MI, the QDG model is able to represent a job-shop with a discrete production environment and to calculate production metrics. This work has been employed in the production system of a Bosch factory, in Portugal, using their manufacturing data sets for validation. Different variants of two well-known bottleneck detection methods were implemented and adapted to Bosch’s use case: the Active Period Method and the Average Active Period Method.","PeriodicalId":46578,"journal":{"name":"International Journal of Management Science and Engineering Management","volume":" ","pages":""},"PeriodicalIF":3.0000,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Management Science and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/17509653.2022.2116121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 1

Abstract

ABSTRACT In the context of bottleneck detection, most data-driven approaches employ data from diverse production variables (machine processing times, machine state tags, input timestamps, etc.) for a detailed analysis of bottlenecks. However, for manufacturing companies initiating their digitalization process (i.e. requiring the smallest hardware investment), a bottom-top approach is still missing. In this work, a data-driven model based on minimal information (MI) retrieved from a manufacturing execution system is proposed for bottleneck detection. We consider MI timestamps when each product exits each station and show that this is the most elementary information from production-line operations, enough to autonomously generate an abstract manufacturing layout, and to detect and predict bottlenecks. A general abstract model of a production line is proposed, named queue directed graph (QDG). Incorporating the MI, the QDG model is able to represent a job-shop with a discrete production environment and to calculate production metrics. This work has been employed in the production system of a Bosch factory, in Portugal, using their manufacturing data sets for validation. Different variants of two well-known bottleneck detection methods were implemented and adapted to Bosch’s use case: the Active Period Method and the Average Active Period Method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一个数据驱动的模型与最小的瓶颈检测信息-应用在博世热技术
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
8.50
自引率
33.30%
发文量
40
期刊介绍: International Journal of Management Science and Engineering Management (IJMSEM) is a peer-reviewed quarterly journal that provides an international forum for researchers and practitioners of management science and engineering management. The journal focuses on identifying problems in the field, and using innovative management theories and new management methods to provide solutions. IJMSEM is committed to providing a platform for researchers and practitioners of management science and engineering management to share experiences and communicate ideas. Articles published in IJMSEM contain fresh information and approaches. They provide key information that will contribute to new scientific inquiries and improve competency, efficiency, and productivity in the field. IJMSEM focuses on the following: 1. identifying Management Science problems in engineering; 2. using management theory and methods to solve above problems innovatively and effectively; 3. developing new management theory and method to the newly emerged management issues in engineering; IJMSEM prefers papers with practical background, clear problem description, understandable physical and mathematical model, physical model with practical significance and theoretical framework, operable algorithm and successful practical applications. IJMSEM also takes into account management papers of original contributions in one or several aspects of these elements.
期刊最新文献
Controllable processing times with limited resources and energy consumption in flow shops: an assessment by simulation Measuring economic resilience of manufacturing organization leveraging integrated data envelopment analysis (DEA)-machine learning approach Risk assessment and governance path of social media rumors based on GRA and FsQCA A new fuzzy bi-objective mixed-integer linear programming for designing a medical waste management network in the Coronavirus epidemic: a case study A novel swarm intelligence approach for the constrained scheduling problem
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1