Thermal Behavior of the early Life of an Aluminum Electrolysis Cell

IF 0.8 Q3 ENGINEERING, MULTIDISCIPLINARY International Journal of Engineering Research in Africa Pub Date : 2022-07-25 DOI:10.4028/p-v5kt07
Mohamed M. Ali, Khalid Yuossif, G. Abdalla, E. Elbadry
{"title":"Thermal Behavior of the early Life of an Aluminum Electrolysis Cell","authors":"Mohamed M. Ali, Khalid Yuossif, G. Abdalla, E. Elbadry","doi":"10.4028/p-v5kt07","DOIUrl":null,"url":null,"abstract":"The electrolytic production of aluminium starts after the completion of the cathode lining and the baking process. After that, the cell start-up period is followed by the early operating period. During the early operating period, the following parameters (cell voltage, metal height, electrolyte height, cryolite ratio, electrolyte temperature, and ledge formation) were measured and investigated. The required times for these parameters to reach the steady-state have been investigated. The cell voltage, metal height, electrolyte height, cryolite ratio, and electrolyte temperature were stabilized after 35, 25, 24, 86, and 45 days, respectively from cell start-up. These cells took four months to form a stable ledge at a thickness of 10 cm. Also, the thermal behavior of the sidewall carbon blocks was studied during the early operating period by inserting twenty thermocouples at these locations in three prebaked cells. The cell instability during the early operation period for these cells was illustrated.","PeriodicalId":45925,"journal":{"name":"International Journal of Engineering Research in Africa","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2022-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research in Africa","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4028/p-v5kt07","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

The electrolytic production of aluminium starts after the completion of the cathode lining and the baking process. After that, the cell start-up period is followed by the early operating period. During the early operating period, the following parameters (cell voltage, metal height, electrolyte height, cryolite ratio, electrolyte temperature, and ledge formation) were measured and investigated. The required times for these parameters to reach the steady-state have been investigated. The cell voltage, metal height, electrolyte height, cryolite ratio, and electrolyte temperature were stabilized after 35, 25, 24, 86, and 45 days, respectively from cell start-up. These cells took four months to form a stable ledge at a thickness of 10 cm. Also, the thermal behavior of the sidewall carbon blocks was studied during the early operating period by inserting twenty thermocouples at these locations in three prebaked cells. The cell instability during the early operation period for these cells was illustrated.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
铝电解槽早期寿命的热行为
铝的电解生产在完成阴极内衬和烘烤工序后开始。之后是细胞启动期,接着是早期工作期。在工作初期,测量和研究了以下参数(电池电压、金属高度、电解质高度、冰晶石比、电解质温度和壁架形成)。研究了这些参数达到稳态所需的时间。电池电压、金属高度、电解质高度、冰晶石比和电解质温度分别在电池启动后35、25、24、86和45天后稳定。这些细胞花了4个月的时间才形成10厘米厚的稳定壁架。此外,通过在三个预焙电池的这些位置插入20个热电偶,研究了侧壁碳块在早期运行期间的热行为。说明了这些细胞在手术初期的细胞不稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.80
自引率
14.30%
发文量
62
期刊介绍: "International Journal of Engineering Research in Africa" is a peer-reviewed journal which is devoted to the publication of original scientific articles on research and development of engineering systems carried out in Africa and worldwide. We publish stand-alone papers by individual authors. The articles should be related to theoretical research or be based on practical study. Articles which are not from Africa should have the potential of contributing to its progress and development.
期刊最新文献
Geometrical Parameter Optimization of Circular Cross-Section Conformal Cooling Channels in Injection Molds of Plastic Paving Block Molds International Journal of Engineering Research in Africa Vol. 70 Transient Stability Analysis of an Integrated Photovoltaic Systems in a Power System Numerical Finite Element Analysis of Cracked Stainless-Steel Pipe Repaired by GFRP in a Moist Environment Prediction of Flexural Properties of Additively Manufactured Short Fiber-Reinforced Polymer Composite Parts
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1