Managing the dam breach modelling and mapping of reservoirs in Wales

Q4 Earth and Planetary Sciences Dams and Reservoirs Pub Date : 2022-04-12 DOI:10.1680/jdare.22.00095
Emma Bullen
{"title":"Managing the dam breach modelling and mapping of reservoirs in Wales","authors":"Emma Bullen","doi":"10.1680/jdare.22.00095","DOIUrl":null,"url":null,"abstract":"The Welsh Government enacted an amendment to the Reservoirs Act 1975 reducing the qualifying capacity of large raised reservoirs to 10,000m3 from 25,000m3.  This led to an increase in the number of reservoirs falling within the Reservoirs Act in Wales. In 2019, Natural Resources Wales (NRW) appointed Arcadis to undertake the production of a suite of reservoir inundation maps for over 180 reservoirs across Wales using the Environment Agency's Reservoir Flood Mapping specification. Following production of these maps an opinion on the risk designation was provided. Throughout the project several Arcadis teams collaborated to produce project specific documentation, develop tools for automation, run hydraulic models and produce the mapping, in line with the specification requirements. Upon request by NRW, modelling of the cascades was modified, allowing cascade reservoirs to breach due to a fluvial scenario. Following this modification, it became apparent some cascade reservoirs were being incorrectly triggered. Therefore, further changes to how cascade reservoirs were modelled were made to ensure they were triggered correctly.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00095","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

The Welsh Government enacted an amendment to the Reservoirs Act 1975 reducing the qualifying capacity of large raised reservoirs to 10,000m3 from 25,000m3.  This led to an increase in the number of reservoirs falling within the Reservoirs Act in Wales. In 2019, Natural Resources Wales (NRW) appointed Arcadis to undertake the production of a suite of reservoir inundation maps for over 180 reservoirs across Wales using the Environment Agency's Reservoir Flood Mapping specification. Following production of these maps an opinion on the risk designation was provided. Throughout the project several Arcadis teams collaborated to produce project specific documentation, develop tools for automation, run hydraulic models and produce the mapping, in line with the specification requirements. Upon request by NRW, modelling of the cascades was modified, allowing cascade reservoirs to breach due to a fluvial scenario. Following this modification, it became apparent some cascade reservoirs were being incorrectly triggered. Therefore, further changes to how cascade reservoirs were modelled were made to ensure they were triggered correctly.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
管理大坝决口建模和绘制威尔士水库
威尔士政府颁布了《1975年水库法》修正案,将大型水库的合格容量从25000m3降至10000m3。这导致威尔士《水库法》范围内的水库数量增加。2019年,威尔士自然资源局(NRW)任命Arcadis使用环境署的水库洪水测绘规范,为威尔士180多座水库绘制一套水库淹没地图。在绘制这些地图后,提供了关于风险指定的意见。在整个项目中,几个Arcadis团队合作,根据规范要求编制项目特定文档,开发自动化工具,运行水力模型并绘制地图。根据NRW的要求,对梯级模型进行了修改,允许梯级水库因河流情况而决口。在这一修改之后,很明显,一些梯级水库被错误地触发了。因此,对梯级水库的建模方式进行了进一步的更改,以确保它们被正确触发。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
期刊最新文献
Leeds FAS2 FSR: environmental challenges for the design of an in-river control structure Simulating a reservoir on-site flood plan test: Operation Redbrook Dunside reservoirs discontinuance – taking a new approach Undertaking RARS assessments for Hong Kong reservoirs Assessment the stability of earth dams based on construction pace by fuzzy inference logic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1