{"title":"Analisa Potensi Embung Itera Sebagai Pembangkit Listrik Tenaga Pico Hydro (PLTPH)","authors":"Dean Corio, Kiki Kananda, S KhansaSalsabila","doi":"10.25077/jnte.v8n3.691.2019","DOIUrl":null,"url":null,"abstract":"Institut Teknologi Sumatera (ITERA) has 5 reservoirs with lip embankment construction higher than the normal water level and have steep elevations with different catchment areas (DTA). By using the Google Earth Pro software, it is known that DTA reservoirs A, B, C, D, and E are respectively 1.728 ha; 1,146 ha; 1,052 ha; 0.844 ha; and 9.562 ha. This study aims to determine the potential energy that might be generated from the 5 reservoirs while still considering the integrity of the ecosystem. The power plant is in the form of a Pico hydro power plant that can be used as a power plant practicum media by Itera students, especially electrical engineering study program students. The power plant's rapid pipe is designed to be installed 1 meter below the normal water level and the operating time is based on the rain discharge that is accommodated by the reservoir in one month. The method used is field observation, rainfall data collection, calculations using practical rational methods and hydropower hydraulics. The results of data processing of five reservoirs owned by ITERA show that the greatest potential that can be used as a source of electricity generation is reservoirs E. The analysis shows that the discharge capacity of 0.216 m3 / s and an effective head of 5.46 m can produce an electric power generated of 7,071 kW with operational time at April. Keywords : Discharge, Rain Intensity, Pico Hydro. Abstrak Institut Teknologi Sumatera (ITERA) memiliki 5 embung dengan konstruksi bibir embung lebih tinggi dari batas muka air normalnya serta memiliki elevasi curam dengan luasan Daerah Tangkapan Air (DTA) masing masing-nya berbeda. Melalui software Google Earth Pro diketahui luas DTA embung A, B, C, D, dan E secara berturut-turut yaitu 1,728 ha; 1,146 ha; 1,052 ha; 0,844 ha; dan 9,562 ha. Penelitian ini bertujuan untuk mengetahui potensi energi yang mungkin dibangkitkan dari 5 embung tersebut dengan tetap mempertimbangkan keutuhan ekosistemnya. Pembangkit berupa pembangkit listrik tenaga pico hydro yang dapat digunakan sebagai media praktikum pembangkit tenaga listrik oleh mahasiswa Itera, khususnya mahasiswa program studi teknik elektro. Pipa pesat pembangkit listrik didesain terpasang 1 meter dibawah muka air normal dan waktu pengoperasian berdasarkan debit hujan yang tertampung oleh embung dalam satu bulan. Metoda yang dilakukan adalah observasi lapangan, pengumpulan data curah hujan, perhitungan menggunakan metode rasional praktis dan persamaan daya hidraulik tenaga air. Hasil pengolahan data lima embung yang dimiliki Itera didapatkan potensi terbesar yang bisa dimanfaatkan sebagai sumber pembangkit listrik adalah embung E. Hasil analisa menunjukkan debit tampungan 0,216 m 3 /s dan head efektif 5,46 m dapat menghasilkan daya listrik terbangkitkan sebesar 7,071 kW dengan waktu operasional pada bulan April. Kata Kunci : Debit, Intensitas Hujan, Pico Hydro.","PeriodicalId":30660,"journal":{"name":"Jurnal Nasional Teknik Elektro","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Nasional Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/jnte.v8n3.691.2019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Institut Teknologi Sumatera (ITERA) has 5 reservoirs with lip embankment construction higher than the normal water level and have steep elevations with different catchment areas (DTA). By using the Google Earth Pro software, it is known that DTA reservoirs A, B, C, D, and E are respectively 1.728 ha; 1,146 ha; 1,052 ha; 0.844 ha; and 9.562 ha. This study aims to determine the potential energy that might be generated from the 5 reservoirs while still considering the integrity of the ecosystem. The power plant is in the form of a Pico hydro power plant that can be used as a power plant practicum media by Itera students, especially electrical engineering study program students. The power plant's rapid pipe is designed to be installed 1 meter below the normal water level and the operating time is based on the rain discharge that is accommodated by the reservoir in one month. The method used is field observation, rainfall data collection, calculations using practical rational methods and hydropower hydraulics. The results of data processing of five reservoirs owned by ITERA show that the greatest potential that can be used as a source of electricity generation is reservoirs E. The analysis shows that the discharge capacity of 0.216 m3 / s and an effective head of 5.46 m can produce an electric power generated of 7,071 kW with operational time at April. Keywords : Discharge, Rain Intensity, Pico Hydro. Abstrak Institut Teknologi Sumatera (ITERA) memiliki 5 embung dengan konstruksi bibir embung lebih tinggi dari batas muka air normalnya serta memiliki elevasi curam dengan luasan Daerah Tangkapan Air (DTA) masing masing-nya berbeda. Melalui software Google Earth Pro diketahui luas DTA embung A, B, C, D, dan E secara berturut-turut yaitu 1,728 ha; 1,146 ha; 1,052 ha; 0,844 ha; dan 9,562 ha. Penelitian ini bertujuan untuk mengetahui potensi energi yang mungkin dibangkitkan dari 5 embung tersebut dengan tetap mempertimbangkan keutuhan ekosistemnya. Pembangkit berupa pembangkit listrik tenaga pico hydro yang dapat digunakan sebagai media praktikum pembangkit tenaga listrik oleh mahasiswa Itera, khususnya mahasiswa program studi teknik elektro. Pipa pesat pembangkit listrik didesain terpasang 1 meter dibawah muka air normal dan waktu pengoperasian berdasarkan debit hujan yang tertampung oleh embung dalam satu bulan. Metoda yang dilakukan adalah observasi lapangan, pengumpulan data curah hujan, perhitungan menggunakan metode rasional praktis dan persamaan daya hidraulik tenaga air. Hasil pengolahan data lima embung yang dimiliki Itera didapatkan potensi terbesar yang bisa dimanfaatkan sebagai sumber pembangkit listrik adalah embung E. Hasil analisa menunjukkan debit tampungan 0,216 m 3 /s dan head efektif 5,46 m dapat menghasilkan daya listrik terbangkitkan sebesar 7,071 kW dengan waktu operasional pada bulan April. Kata Kunci : Debit, Intensitas Hujan, Pico Hydro.
苏门答腊理工学院(ITERA)有5个水库,其唇堤施工高于正常水位,海拔陡峭,集水区(DTA)不同。利用谷歌Earth Pro软件,得到DTA储层A、B、C、D、E分别为1.728 ha;1146公顷;1052公顷;0.844公顷;9562公顷。本研究旨在确定5个水库可能产生的势能,同时仍考虑生态系统的完整性。电厂为Pico水电站形式,可作为Itera学生,特别是电气工程专业学生的电厂实习媒体。电站快速管设计安装在正常水位以下1米处,运行时间按水库一个月的容雨量计算。所采用的方法是野外观测、降水资料收集、实用合理方法计算和水电水力计算。对ITERA所属5个水库的数据处理结果表明,e水库的发电潜力最大,其泄流量为0.216 m3 / s,有效水头为5.46 m, 4月份运行时可发电7071 kW。关键词:放电,雨强,微水力。【摘要】苏门答腊理工学院(ITERA) memiliki 5 emung dengan konstruksi bibiir emung lebih tinggi dari batas muka air normalnalta memiliki elevasi curam dengan luasan Daerah Tangkapan air (DTA) masmasing -nya berbeda。Melalui软件谷歌Earth Pro diketahui的DTA包含A, B, C, D, D, E, secara - turtututuyitu 1728 ha;1146公顷;1052公顷;0844公顷;9,562公顷。Penelitian ini bertujuan untuk mengetahui potentisi energi yang mungkin dibangkitkan dari 5 embung teresbut dengan tetap成员pertimbangkan keutuhan ekosistemnya。Pembangkit berupa Pembangkit listrik tenaga pico hydro yang dapat digunakan sebagai media praktikum Pembangkit tenstrik oleh mahasiswa Itera, khususnya mahasiswa程序研究teknik elektro。Pipa pesat pembangkit listrik didesain terpasang 1米dibawah muka空气正常丹waktu pengoperasian berdasarkan借hujan yang tertampung oleh embung dalam satu bulan。云南气象学,云南气象学,云南气象学,云南气象学,云南气象学,云南气象学,云南气象学,云南气象学,云南气象学,云南气象学,云南气象学。Hasil pengolahan数据lima embung yang dimiliki Itera didapatkan potensi terbesar yang bisa dimanfaatkan sebagai sumber pembangkit listrik adalah embung E. Hasil analisa menunjukkan debit tampungan 0,216 m /s, head efektif 5,46 m dapat menghasilkan daya listrik terbangkitkan sebesar 7,071 kW, dengan waktu操作pada bulan四月。Kata Kunci: Debit, Intensitas Hujan, Pico Hydro。