A branch and bound algorithm for solving large-scale single-machine scheduling problems with non-identical release dates

IF 1.4 4区 工程技术 Q3 ENGINEERING, INDUSTRIAL European Journal of Industrial Engineering Pub Date : 2018-02-19 DOI:10.1504/EJIE.2018.089879
S. H. Zegordi, M. Yavari
{"title":"A branch and bound algorithm for solving large-scale single-machine scheduling problems with non-identical release dates","authors":"S. H. Zegordi, M. Yavari","doi":"10.1504/EJIE.2018.089879","DOIUrl":null,"url":null,"abstract":"In this paper, we have examined minimising the total completion times in a single-machine scheduling problem with non-identical job release dates. This problem is known to be strongly NP-hard. We have proposed an effective lower bound-based. Also, a near optimal heuristic has been presented that has an average gap of less than 0.077% from the optimum solution. Additionally, in 18% of the problem instances with up to 60 jobs, the upper bound value is equal to the lower bound value. Then we provide two dominance properties. Subsequently, the proposed lower bound, upper bound and dominance properties have been applied in the branch and bound method and have been tested in a wide range of instances. Computational experiments demonstrate the ability of the proposed method to solve hard and large-size problems with up to 130 jobs within a reasonable time. [Received 19 June 2015; Revised 26 November 2016; Revised 24 January 2017; Accepted 5 September 2017]","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":"12 1","pages":"24-42"},"PeriodicalIF":1.4000,"publicationDate":"2018-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/EJIE.2018.089879","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2018.089879","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 4

Abstract

In this paper, we have examined minimising the total completion times in a single-machine scheduling problem with non-identical job release dates. This problem is known to be strongly NP-hard. We have proposed an effective lower bound-based. Also, a near optimal heuristic has been presented that has an average gap of less than 0.077% from the optimum solution. Additionally, in 18% of the problem instances with up to 60 jobs, the upper bound value is equal to the lower bound value. Then we provide two dominance properties. Subsequently, the proposed lower bound, upper bound and dominance properties have been applied in the branch and bound method and have been tested in a wide range of instances. Computational experiments demonstrate the ability of the proposed method to solve hard and large-size problems with up to 130 jobs within a reasonable time. [Received 19 June 2015; Revised 26 November 2016; Revised 24 January 2017; Accepted 5 September 2017]
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
求解非相同发布日期的大规模单机调度问题的分支定界算法
在本文中,我们研究了具有不相同作业发布日期的单机调度问题中最小化总完成时间的问题。这个问题被认为是强np困难的。我们提出了一个有效的下限。此外,还提出了一种接近最优的启发式算法,其与最优解的平均差距小于0.077%。此外,在最多60个作业的18%的问题实例中,上限值等于下限值。然后我们给出两个支配性。随后,将所提出的下界、上界和优势性质应用于分支定界方法中,并在广泛的实例中进行了验证。计算实验表明,该方法能够在合理的时间内解决多达130个作业的困难和大规模问题。[2015年6月19日收到;2016年11月26日修订;2017年1月24日修订;接受2017年9月5日]
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
European Journal of Industrial Engineering
European Journal of Industrial Engineering 工程技术-工程:工业
CiteScore
2.60
自引率
20.00%
发文量
55
审稿时长
6 months
期刊介绍: EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.
期刊最新文献
A collaborative model for predictive maintenance of after-sales equipment based on digital twin An integrated two dimensional cutting stock and lot sizing problem with two criteria Third-party remanufacturing modes with integrated tax-subsidy policy Blockchain capabilities for supply chain management An integrated Markov chain model for the economic-statistical design of adaptive multivariate control charts and maintenance planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1