Solution for bi-objective single row facility layout problem using artificial bee colony algorithm

IF 1.4 4区 工程技术 Q3 ENGINEERING, INDUSTRIAL European Journal of Industrial Engineering Pub Date : 2018-03-26 DOI:10.1504/EJIE.2018.090619
L. Nagarajan, S. Mahalingam, Selvakumar Gurusamy, V. Dharmaraj
{"title":"Solution for bi-objective single row facility layout problem using artificial bee colony algorithm","authors":"L. Nagarajan, S. Mahalingam, Selvakumar Gurusamy, V. Dharmaraj","doi":"10.1504/EJIE.2018.090619","DOIUrl":null,"url":null,"abstract":"The single row facility layout problem (SRFLP) is concerned with the arrangements of machineries in a single line for processing multiple products. This arrangement is termed as linear machine sequence (lms). The aim of the proposed work is to design a best lms that simultaneously minimises the objectives: the total flow distance of the products (D); and the total length of the flow line (L) needed for accommodating the machineries in the shop floor. Consideration of more than one objective in a multi-product environment in bi-objective single row facility layout problem (BOSRFLP) is an NP-hard problem. Hence, artificial bee colony (ABC) algorithm is applied to identify the best lms. The effectiveness of the proposed algorithm is verified by solving the problems discussed in the literature. Maximum of 37.54% reduction in total flow distance and 9.31% reduction in total length of the flow line are achieved by the proposed method. [Revise 21 September 2017; Received 27 November 2016; Accepted on 29 December 2017]","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":"12 1","pages":"252-275"},"PeriodicalIF":1.4000,"publicationDate":"2018-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/EJIE.2018.090619","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2018.090619","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 8

Abstract

The single row facility layout problem (SRFLP) is concerned with the arrangements of machineries in a single line for processing multiple products. This arrangement is termed as linear machine sequence (lms). The aim of the proposed work is to design a best lms that simultaneously minimises the objectives: the total flow distance of the products (D); and the total length of the flow line (L) needed for accommodating the machineries in the shop floor. Consideration of more than one objective in a multi-product environment in bi-objective single row facility layout problem (BOSRFLP) is an NP-hard problem. Hence, artificial bee colony (ABC) algorithm is applied to identify the best lms. The effectiveness of the proposed algorithm is verified by solving the problems discussed in the literature. Maximum of 37.54% reduction in total flow distance and 9.31% reduction in total length of the flow line are achieved by the proposed method. [Revise 21 September 2017; Received 27 November 2016; Accepted on 29 December 2017]
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用人工蜂群算法求解双目标单行设施布局问题
单排设备布置问题(SRFLP)是指在一条生产线上处理多种产品的设备布置问题。这种排列称为线性机器序列(lms)。拟议工作的目的是设计一个同时最小化目标的最佳lms:产品的总流动距离(D);以及容纳车间机器所需的流水线的总长度(L)。考虑多产品环境下多个目标的双目标单排设施布局问题(BOSRFLP)是一个np难题。因此,采用人工蜂群(ABC)算法来识别最佳lms。通过解决文献中讨论的问题,验证了所提算法的有效性。该方法最大可使总流距减少37.54%,总流线长度减少9.31%。[2017年9月21日修订;收到2016年11月27日;于2017年12月29日接受]
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
European Journal of Industrial Engineering
European Journal of Industrial Engineering 工程技术-工程:工业
CiteScore
2.60
自引率
20.00%
发文量
55
审稿时长
6 months
期刊介绍: EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.
期刊最新文献
A collaborative model for predictive maintenance of after-sales equipment based on digital twin An integrated two dimensional cutting stock and lot sizing problem with two criteria Third-party remanufacturing modes with integrated tax-subsidy policy Blockchain capabilities for supply chain management An integrated Markov chain model for the economic-statistical design of adaptive multivariate control charts and maintenance planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1