A. Bachayo, A. Memon, M. Hussain, I. Rahman, S. Ahmed
{"title":"Risk Level of Design and Procurement Factors Causing Construction Waste Generation","authors":"A. Bachayo, A. Memon, M. Hussain, I. Rahman, S. Ahmed","doi":"10.2478/jaes-2022-0002","DOIUrl":null,"url":null,"abstract":"Abstract Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related factors and assessed their risk level in causing construction waste. Data was collected through questionnaire survey amongst the practitioners from client consultants and contractors working on construction projects in Karachi and Hyderabad division of the Sind province. A total of 72 completed questionnaire forms were analysed and the results shows that 8 of the 20 factors are highly important factors and fall in the red zone of the risk matrix. It was also observed that last minute client requirements is reported as most important factor in design related issues while “items not in compliance with specification” is the most risk factor in the category of the procurement. Besides these, “last minute client requirements” and “Mistakes in quantity surveys” are the key factors which have significant effect on project cost. The findings of this study will be helpful for the practitioner to improve design and procurement quality for controlling the waste generation.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2022-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jaes-2022-0002","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 2
Abstract
Abstract Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related factors and assessed their risk level in causing construction waste. Data was collected through questionnaire survey amongst the practitioners from client consultants and contractors working on construction projects in Karachi and Hyderabad division of the Sind province. A total of 72 completed questionnaire forms were analysed and the results shows that 8 of the 20 factors are highly important factors and fall in the red zone of the risk matrix. It was also observed that last minute client requirements is reported as most important factor in design related issues while “items not in compliance with specification” is the most risk factor in the category of the procurement. Besides these, “last minute client requirements” and “Mistakes in quantity surveys” are the key factors which have significant effect on project cost. The findings of this study will be helpful for the practitioner to improve design and procurement quality for controlling the waste generation.
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.