Factors Affecting Time Overrun In Government Affordable Housing Construction: The Case Of Maharashtra Housing Area Development Authority (MHADA) In Pune Metropolitan Area
{"title":"Factors Affecting Time Overrun In Government Affordable Housing Construction: The Case Of Maharashtra Housing Area Development Authority (MHADA) In Pune Metropolitan Area","authors":"Prasanna Samadhan Gawale","doi":"10.37896/jxu15.3/002","DOIUrl":null,"url":null,"abstract":"Construction industry is considered as a locomotive of the national economy; it has significant effect on the efficiency and productivity of all sectors. The ongoing urban housing development in this industry certain patterns have indicated an arrangement towards market-situated types of housing pair with globalization and the development of the Indian economy (Sengupta and Tipple, 2007). This study is aimed to identify and examine the major factors that contribute to construction time overruns, their negative effects and possible solutions to overcome such delays from Indian construction industries Accessing the different factors affecting the time overrun necessary recommendations has been provided through this report for the stated problem","PeriodicalId":35710,"journal":{"name":"西安电子科技大学学报","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"西安电子科技大学学报","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37896/jxu15.3/002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0
Abstract
Construction industry is considered as a locomotive of the national economy; it has significant effect on the efficiency and productivity of all sectors. The ongoing urban housing development in this industry certain patterns have indicated an arrangement towards market-situated types of housing pair with globalization and the development of the Indian economy (Sengupta and Tipple, 2007). This study is aimed to identify and examine the major factors that contribute to construction time overruns, their negative effects and possible solutions to overcome such delays from Indian construction industries Accessing the different factors affecting the time overrun necessary recommendations has been provided through this report for the stated problem