The management of construction projects in Iraq and the most important reasons for the delay

IF 0.8 Q4 ENGINEERING, INDUSTRIAL Acta Logistica Pub Date : 2023-03-31 DOI:10.22306/al.v10i1.351
Layth AL musawi, S. Naimi
{"title":"The management of construction projects in Iraq and the most important reasons for the delay","authors":"Layth AL musawi, S. Naimi","doi":"10.22306/al.v10i1.351","DOIUrl":null,"url":null,"abstract":"In Iraq, there is a vast construction movement. Still, it is accompanied by many problems, the most important of which is the delay in completing projects during the specified time. The time must be optimized by adopting the leadership practice and dedicating it to the benefit of performing the process and functions of the project. The research aims to identify the most important reasons and factors that affect the project delivery process within the specified period. The investigation initially dealt with the most important previous studies, on this subject, by researchers, then touched on the concept of construction projects, their types and details. A questionnaire containing reasons for the delay was identified and divided into several items. It concluded that the most common reasons for delays are delays in laboratory testing of materials, assignment of works to the lowest bidder, contractors' financial incompetence, and high building materials prices. The most crucial factor is to streamline building material inspection procedures, set up inspection laboratories on several occasions and assess the contractor's effectiveness and ability to implement before the project is referred financially. Organizations and individuals should coordinate their work between the construction departments to prevent any issues that may arise during completing tasks.","PeriodicalId":36880,"journal":{"name":"Acta Logistica","volume":" ","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2023-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Logistica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22306/al.v10i1.351","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

In Iraq, there is a vast construction movement. Still, it is accompanied by many problems, the most important of which is the delay in completing projects during the specified time. The time must be optimized by adopting the leadership practice and dedicating it to the benefit of performing the process and functions of the project. The research aims to identify the most important reasons and factors that affect the project delivery process within the specified period. The investigation initially dealt with the most important previous studies, on this subject, by researchers, then touched on the concept of construction projects, their types and details. A questionnaire containing reasons for the delay was identified and divided into several items. It concluded that the most common reasons for delays are delays in laboratory testing of materials, assignment of works to the lowest bidder, contractors' financial incompetence, and high building materials prices. The most crucial factor is to streamline building material inspection procedures, set up inspection laboratories on several occasions and assess the contractor's effectiveness and ability to implement before the project is referred financially. Organizations and individuals should coordinate their work between the construction departments to prevent any issues that may arise during completing tasks.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
伊拉克建筑项目的管理和延误的最重要原因
在伊拉克,有一场大规模的建筑运动。尽管如此,它也伴随着许多问题,其中最重要的是在指定时间内完成项目的延迟。时间必须通过采用领导实践来优化,并将其用于执行项目的过程和功能。本研究旨在确定在规定期限内影响项目交付过程的最重要原因和因素。该调查最初涉及研究人员此前对该主题最重要的研究,然后涉及建筑项目的概念、类型和细节。确定了一份包含延误原因的调查表,并将其分为几个项目。它得出的结论是,延误的最常见原因是材料实验室测试的延误、将工程分配给出价最低的投标人、承包商的财务无能以及建筑材料价格高。最关键的因素是简化建筑材料检验程序,在多次设立检验实验室,并在项目获得资金支持之前评估承包商的有效性和实施能力。组织和个人应协调施工部门之间的工作,以防止在完成任务过程中出现任何问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Acta Logistica
Acta Logistica Engineering-Industrial and Manufacturing Engineering
CiteScore
1.80
自引率
28.60%
发文量
36
审稿时长
4 weeks
期刊最新文献
Simulation of operations on the production line as a tool for making the production process more efficient The disruptive times of Covid-19: higher education leadership and management logistics in Arab nations Streamlining logistics flows with lean tools using TX Plant Simulation software support Improving allocation and layout in production logistics Assessing the Bullwhip effect in supply chain: trends, gaps, and overlaps
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1