{"title":"Discontinuance of Lower Neuadd Reservoir","authors":"D. Neeve, V. Stoyanova, B. Cotter, J. Clewer","doi":"10.1680/jdare.22.00086","DOIUrl":null,"url":null,"abstract":"Lower Neuadd Reservoir was created by an embankment dam constructed in 1884 in what has since become the Brecon Beacons National Park. The dam and spillway have exhibited a long history of concerns surrounding their integrity. The deteriorating spillway channel, faulty scour valve, and the leakage through the core with associated settlement of the embankment dam reached a point where remediation was not reasonably practical. The chosen solution was discontinuance by excavating a notch through the embankment dam. Obtaining permission to alter listed structures within a national park required detailed environmental assessments and negotiation with the authorities. Construction was complicated by a mountainous catchment that created significant flows at low return periods that could fill the empty reservoir basin in hours and overtop the works.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Lower Neuadd Reservoir was created by an embankment dam constructed in 1884 in what has since become the Brecon Beacons National Park. The dam and spillway have exhibited a long history of concerns surrounding their integrity. The deteriorating spillway channel, faulty scour valve, and the leakage through the core with associated settlement of the embankment dam reached a point where remediation was not reasonably practical. The chosen solution was discontinuance by excavating a notch through the embankment dam. Obtaining permission to alter listed structures within a national park required detailed environmental assessments and negotiation with the authorities. Construction was complicated by a mountainous catchment that created significant flows at low return periods that could fill the empty reservoir basin in hours and overtop the works.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
下纽阿德水库停产
Lower Neuadd水库是由1884年在布雷肯灯塔国家公园建造的堤坝建造的。大坝和溢洪道的完整性问题由来已久。泄洪道的恶化、冲刷阀的故障以及通过堆芯的泄漏以及堤坝的相关沉降,已经到了修复不可行的地步。选择的解决方案是通过在堤坝上挖掘一个缺口来中断。要获得更改国家公园内列出的结构的许可,需要进行详细的环境评估并与当局协商。由于山区集水区在低重现期产生大量流量,可能在数小时内填满空的水库流域,并淹没工程,施工变得复杂。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
期刊最新文献
Leeds FAS2 FSR: environmental challenges for the design of an in-river control structure Simulating a reservoir on-site flood plan test: Operation Redbrook Dunside reservoirs discontinuance – taking a new approach Undertaking RARS assessments for Hong Kong reservoirs Assessment the stability of earth dams based on construction pace by fuzzy inference logic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1