{"title":"REVIEW OF FINANCIAL PENALTIES IMPLEMENTATION ON NON-COMPLIANCE WITH ROAD PERFORMANCE INDICATORS","authors":"Tisara Sita, A. Mulyono, Suryo Hapsoro Tri Utomo","doi":"10.11113/aej.v13.19000","DOIUrl":null,"url":null,"abstract":"Indonesia's national road preservation system, mainly routine road maintenance, was initially carried out independently by the project manager as a road section manager. This maintenance has been transformed into a \"long segment\" scheme since 2016. The contractor is subject to financial penalties in the form of withholding payments for each failure to meet the road performance indicators within the specified repair response times. The government, specifically the project manager, has not adequately applied the current financial penalties for late fulfillment of road performance indicators in Indonesia. The implementation of financial penalties that is not adequate is inversely proportional to the number of public complaints related to road performance, which represents the impact of road performance that does not meet the criteria. This study recommends developing a comprehensive policy for penalties related to the late fulfillment of road performance indicators. The policy should consider multiple indicators and components and adjust the coefficient of each component based on the severity of the condition. In addition, this study advises revising the formulation of financial penalties using relevant data, such as average daily traffic volume or public complaints.","PeriodicalId":36749,"journal":{"name":"ASEAN Engineering Journal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/aej.v13.19000","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Indonesia's national road preservation system, mainly routine road maintenance, was initially carried out independently by the project manager as a road section manager. This maintenance has been transformed into a "long segment" scheme since 2016. The contractor is subject to financial penalties in the form of withholding payments for each failure to meet the road performance indicators within the specified repair response times. The government, specifically the project manager, has not adequately applied the current financial penalties for late fulfillment of road performance indicators in Indonesia. The implementation of financial penalties that is not adequate is inversely proportional to the number of public complaints related to road performance, which represents the impact of road performance that does not meet the criteria. This study recommends developing a comprehensive policy for penalties related to the late fulfillment of road performance indicators. The policy should consider multiple indicators and components and adjust the coefficient of each component based on the severity of the condition. In addition, this study advises revising the formulation of financial penalties using relevant data, such as average daily traffic volume or public complaints.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
检讨对不符合道路表现指标的人士实施罚款的情况
印度尼西亚的国家道路养护体系,以日常道路养护为主,最初由项目经理作为路段经理独立进行。自2016年以来,这种维护已经转变为“长段”方案。承包商将受到经济处罚,每次未能在规定的维修响应时间内达到道路性能指标,就会被扣留付款。政府,特别是项目经理,没有充分运用目前对印尼道路性能指标逾期履行的经济处罚。罚款力度不够的情况,与道路表现有关的公众投诉数目成反比,反映道路表现不符合标准所造成的影响。本研究建议制定一项全面的政策,对未按时完成道路性能指标的车辆进行处罚。政策应考虑多个指标和组成部分,并根据病情的严重程度调整各组成部分的系数。此外,本研究建议使用相关数据,如平均每日交通量或公众投诉,修改罚款的制定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
ASEAN Engineering Journal
ASEAN Engineering Journal Engineering-Engineering (all)
CiteScore
0.60
自引率
0.00%
发文量
75
期刊最新文献
ACOUSTICAL ANALYSIS FOR THE LECTURE ROOMS IN UNIMAP ULTRASOUND-ASSISTED EXTRACTION OF STARCH FROM OIL PALM TRUNK: AN OPTIMIZATION BY RESPONSE SURFACE METHODOLOGY EVALUATION OF STORM SURGE BEHAVIOR DUE TO DIFFERENT TYPHOON TRACKS AND WIND SPEEDS ALONG THE COAST OF DAGUPAN CITY, LINGAYEN GULF, PHILIPPINES SHEAR STRENGTH OF SOFT CLAY REINFORCED WITH ACRYLONITRILE BUTADIENE STYRENE (ABS) COLUMN CUTTING ANALYSIS ON HORIZONTAL DRIILING USING CUTTING CARRY INDEX, CUTTING TRANSPORT RATIO AND CUTTING CONCENTRATION IN ANNULUS METHOD ON A WELL G FIELD S
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1