Integrated analytic hierarchy process and mixed integer programming for supplier selection in mold and dies industry

Agustinus Silalahi, R. Sukwadi, Duhita Al Hayyu Pramesjwari, C. Oktavia, C. Natalia
{"title":"Integrated analytic hierarchy process and mixed integer programming for supplier selection in mold and dies industry","authors":"Agustinus Silalahi, R. Sukwadi, Duhita Al Hayyu Pramesjwari, C. Oktavia, C. Natalia","doi":"10.30656/jsmi.v3i2.1765","DOIUrl":null,"url":null,"abstract":"PT. GMT has a mission to deliver the products to the customer on time and high-quality products to improve services. Sometimes, the delivery of product delays caused by the raw materials delays or didn't meet specifications. Selection optimal suppliers of raw materials are one of the solutions. There are two factors must be considered for the selection of suppliers, qualitative factors and quantitative factors. In this study, for qualitative factors, based on the criteria needed by PT GMT. This research produces three Linear Programming models, first: a qualitative objective function that will be maximized called the Total Value of Purchase (TVP). TVP is an integration of the Analytical Hierarchy Process (AHP) and Mix Integer Programming Integration. Second, the quantitative objective function for the procurement cost of raw materials, which is called the Total Cost of Purchase (TCP). The third is to optimize qualitative and quantitative simultaneously using the Goal Programming method. The selection of suppliers based on TVP the total value is 97.25, and the total procurement cost is Rp. 36,914,000, based on TCP, the total value is 89.14, and the total of procurement cost is IDR 31,356,000, while based on Goal Programming, the total value is 93.18, and the total of procurement cost is IDR 32,621,000. PT GMT has been able to determine the optimal supplier based on the policies set.","PeriodicalId":53057,"journal":{"name":"Jurnal Sistem dan Manajemen Industri","volume":"3 1","pages":"124-133"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sistem dan Manajemen Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30656/jsmi.v3i2.1765","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

PT. GMT has a mission to deliver the products to the customer on time and high-quality products to improve services. Sometimes, the delivery of product delays caused by the raw materials delays or didn't meet specifications. Selection optimal suppliers of raw materials are one of the solutions. There are two factors must be considered for the selection of suppliers, qualitative factors and quantitative factors. In this study, for qualitative factors, based on the criteria needed by PT GMT. This research produces three Linear Programming models, first: a qualitative objective function that will be maximized called the Total Value of Purchase (TVP). TVP is an integration of the Analytical Hierarchy Process (AHP) and Mix Integer Programming Integration. Second, the quantitative objective function for the procurement cost of raw materials, which is called the Total Cost of Purchase (TCP). The third is to optimize qualitative and quantitative simultaneously using the Goal Programming method. The selection of suppliers based on TVP the total value is 97.25, and the total procurement cost is Rp. 36,914,000, based on TCP, the total value is 89.14, and the total of procurement cost is IDR 31,356,000, while based on Goal Programming, the total value is 93.18, and the total of procurement cost is IDR 32,621,000. PT GMT has been able to determine the optimal supplier based on the policies set.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于层次分析法和混合整数规划的模具行业供应商选择
PT。GMT的使命是按时将产品交付给客户,并提供高质量的产品以改善服务。有时,由于原材料延迟或不符合规范而导致产品交付延迟。选择最佳的原材料供应商是解决方案之一。选择供应商必须考虑两个因素,定性因素和定量因素。在本研究中,针对定性因素,基于PT GMT所需的标准。本研究产生了三个线性规划模型,第一:将被最大化的定性目标函数,称为购买总价值(TVP)。TVP是层次分析法(AHP)和混合整数规划集成的集成。第二,原材料采购成本的量化目标函数,称为采购总成本(TCP)。三是运用目标规划法同时进行定性和定量优化。供应商的选择基于TVP,总价值为97.25卢比,总采购成本为36914000卢比,基于TCP,总价值89.14印尼盾,采购成本总额为31356000印尼盾,而基于目标规划,总价值93.18印尼盾,总采购费用为32621000印尼盾。PT GMT已经能够根据政策集确定最佳供应商。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
10
审稿时长
12 weeks
期刊最新文献
Implementation system monitoring and control temperature and pH in urban silver catfish hatchery to enhance efficiency and responsiveness based on IoT Optimizing business location for small and medium enter¬prises considering travel time uncertainty, natural disasters, and density population: a study case in Jakarta Economic production quantity model with defective items, imperfect rework process, and lost sales Supply chain performance measurement incorporating green factors using the supply chain operations reference on a fertilizer company Intelligent optimisation for multi-objectives flexible manufacturing cells formation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1