A. Viana da Fonseca, D. Cordeiro, F. Molina-Gómez, D. Besenzon, A. Fonseca, C. Ferreira
{"title":"The mechanics of iron tailings from laboratory tests on reconstituted samples collected in post-mortem Dam I in Brumadinho","authors":"A. Viana da Fonseca, D. Cordeiro, F. Molina-Gómez, D. Besenzon, A. Fonseca, C. Ferreira","doi":"10.28927/sr.2022.001122","DOIUrl":null,"url":null,"abstract":"Dam B1 was approximately 85 m high and 700 m long along the crown when it suddenly failed in 25th of January, after 41 years of operations and deposition of tailings at the Paraopeba mining complex (Côrrego de Feijão), in Minas Gerais, Brazil. More than 250 people died and vast economic, social and environmental damages resulted from the collapse. Given the need to geotechnically characterise the tailings within the dam for a credible computational model of the failure, an extensive sampling and laboratory testing campaign took place. The geotechnical laboratory of the Civil Engineering Department at the Faculty of Engineering of the University of Porto (Portugal) was invited by CIMNE, under a contract with VALE, with MPF agreement, to conduct this program. This paper will present a description of the sampling campaigns in the remaining post-mortem dam/reservoir tailings were the failure instability mechanics developed and the experimental program undertaken to test the tailings in advanced laboratory tests. The results that embrace evaluations of the physical, hydraulic and mechanical properties, deduced from integral samples selectively collected and prepared as described, which allowed to define the geotechnical parameters necessary for the referred analyses are here resumed.","PeriodicalId":43687,"journal":{"name":"Soils and Rocks","volume":" ","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2022-04-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Soils and Rocks","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.28927/sr.2022.001122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 1
Abstract
Dam B1 was approximately 85 m high and 700 m long along the crown when it suddenly failed in 25th of January, after 41 years of operations and deposition of tailings at the Paraopeba mining complex (Côrrego de Feijão), in Minas Gerais, Brazil. More than 250 people died and vast economic, social and environmental damages resulted from the collapse. Given the need to geotechnically characterise the tailings within the dam for a credible computational model of the failure, an extensive sampling and laboratory testing campaign took place. The geotechnical laboratory of the Civil Engineering Department at the Faculty of Engineering of the University of Porto (Portugal) was invited by CIMNE, under a contract with VALE, with MPF agreement, to conduct this program. This paper will present a description of the sampling campaigns in the remaining post-mortem dam/reservoir tailings were the failure instability mechanics developed and the experimental program undertaken to test the tailings in advanced laboratory tests. The results that embrace evaluations of the physical, hydraulic and mechanical properties, deduced from integral samples selectively collected and prepared as described, which allowed to define the geotechnical parameters necessary for the referred analyses are here resumed.
在巴西米纳斯吉拉斯的Paraopeba采矿综合体(Côrrego de Feijão)进行了41年的运营和尾矿沉积后,B1大坝于1月25日突然溃坝,大坝高约85米,沿坝顶长约700米。坍塌造成250多人死亡,巨大的经济、社会和环境损失。鉴于需要对大坝内的尾矿进行岩土工程表征,以建立可靠的失效计算模型,因此开展了广泛的采样和实验室测试活动。根据与VALE签订的合同和MPF协议,CIMNE邀请葡萄牙波尔图大学工程学院土木工程系的岩土工程实验室开展该项目。本文将介绍剩余死后大坝/水库尾矿的取样活动,包括开发的破坏不稳定力学和在高级实验室测试中测试尾矿的实验程序。根据所述选择性收集和制备的整体样本推断出的物理、水力和机械性能评估结果,允许定义所述分析所需的岩土参数。
期刊介绍:
Soils and Rocks publishes papers in English in the broad fields of Geotechnical Engineering, Engineering Geology and Environmental Engineering. The Journal is published in April, August and December. The journal, with the name "Solos e Rochas", was first published in 1978 by the Graduate School of Engineering-Federal University of Rio de Janeiro (COPPE-UFRJ).