{"title":"Structural equation model of the barriers to preliminary and sustained BIM adoption in a developing country","authors":"Oluseye Olugboyega, A. Windapo","doi":"10.1108/ci-04-2021-0061","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe purpose of this paper is to investigate the barriers that are constituting significant obstructions to preliminary and sustained BIM adoption in the South African construction industry.\n\n\nDesign/methodology/approach\nImplementation Process Theory was used to develop the theoretical model of barriers to continuous and consistent BIM adoption. This enabled the formulation of two hypotheses, the identification of two sub-constructs (barriers to preliminary BIM adoption and barriers to sustained BIM adoption), and five variables (resources, knowledge, work process, organisational and planning barriers), which were validated using structural equation modelling (SEM).\n\n\nFindings\nThe SEM results show pieces of evidence that validate the hypotheses in the theoretical model. The path analysis confirms that the two sub-constructs and five variables are statistically significant.\n\n\nResearch limitations/implications\nThis research extends the postulations on the barriers to BIM adoption by demonstrating that organisational challenges and planning difficulties constitute barriers to sustained BIM adoption in the South African construction industry.\n\n\nPractical implications\nThe findings of this research are useful in understanding the planning scope and organisational requirements towards continuous and consistent BIM adoption in the South African construction industry.\n\n\nOriginality/value\nThe difficulties with BIM adoption are the issues with the performance of BIM on projects and are the major reason for the non-consistent adoption of BIM on projects. Having difficulties adopting BIM on projects suggests that BIM adoption is majorly on a preliminary or trial basis in the developing countries. This research tests this theory by proposing two types of BIM adoption and their associated barriers.\n","PeriodicalId":45580,"journal":{"name":"Construction Innovation-England","volume":" ","pages":""},"PeriodicalIF":3.5000,"publicationDate":"2021-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation-England","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-04-2021-0061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 7

Abstract

Purpose The purpose of this paper is to investigate the barriers that are constituting significant obstructions to preliminary and sustained BIM adoption in the South African construction industry. Design/methodology/approach Implementation Process Theory was used to develop the theoretical model of barriers to continuous and consistent BIM adoption. This enabled the formulation of two hypotheses, the identification of two sub-constructs (barriers to preliminary BIM adoption and barriers to sustained BIM adoption), and five variables (resources, knowledge, work process, organisational and planning barriers), which were validated using structural equation modelling (SEM). Findings The SEM results show pieces of evidence that validate the hypotheses in the theoretical model. The path analysis confirms that the two sub-constructs and five variables are statistically significant. Research limitations/implications This research extends the postulations on the barriers to BIM adoption by demonstrating that organisational challenges and planning difficulties constitute barriers to sustained BIM adoption in the South African construction industry. Practical implications The findings of this research are useful in understanding the planning scope and organisational requirements towards continuous and consistent BIM adoption in the South African construction industry. Originality/value The difficulties with BIM adoption are the issues with the performance of BIM on projects and are the major reason for the non-consistent adoption of BIM on projects. Having difficulties adopting BIM on projects suggests that BIM adoption is majorly on a preliminary or trial basis in the developing countries. This research tests this theory by proposing two types of BIM adoption and their associated barriers.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
发展中国家初步和持续采用BIM障碍的结构方程模型
本文的目的是调查构成重大障碍的初步和持续的BIM采用在南非建筑业的障碍。设计/方法论/方法实施过程理论用于开发阻碍持续和一致采用BIM的理论模型。这使得我们能够提出两个假设,确定两个子结构(初步采用BIM的障碍和持续采用BIM的障碍)和五个变量(资源、知识、工作过程、组织和规划障碍),并使用结构方程模型(SEM)对其进行验证。扫描电镜结果显示了一些证据,证实了理论模型中的假设。通径分析证实,两个子结构和五个变量具有统计学显著性。研究限制/意义本研究通过证明组织挑战和规划困难构成了南非建筑业持续采用BIM的障碍,扩展了关于BIM采用障碍的假设。实际意义本研究的结果有助于理解规划范围和组织对南非建筑业持续和一致采用BIM的要求。独创性/价值采用BIM的困难是BIM在项目中的性能问题,也是BIM在项目中不一致采用的主要原因。在项目中采用BIM的困难表明,在发展中国家,BIM的采用主要处于初步或试验阶段。本研究通过提出两种类型的BIM采用及其相关障碍来验证这一理论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Construction Innovation-England
Construction Innovation-England CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
7.10
自引率
12.10%
发文量
71
期刊最新文献
Usage of digital technology in improving the mental health of workers on construction sites Uncertainties affecting the offsite construction supply chain resilience: a systematic literature review Developing an interactive pile training module for construction risk management and gaging users’ intentions Impact of trust in virtual project teams: structural equation modelling approach Customized shading solutions for complex building façades: the potential of an innovative cement-textile composite material through a performance-based generative design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1