{"title":"Order acceptance and scheduling in a parallel machine environment with weighted completion time","authors":"Venkata Prasad Palakiti, Usha Mohan, V. Ganesan","doi":"10.1504/EJIE.2018.10014670","DOIUrl":null,"url":null,"abstract":"This paper studies the order acceptance and scheduling (OAS) problem in an identical parallel machine environment where orders are characterised by their revenues, processing times and weights. A mixed integer linear programming (MILP) model is presented for the problem with the objective of maximising the revenue minus the scheduling cost. The problem is NP- hard and a branch and bound (B%B) algorithm is developed to solve the problem. An extension of the B%B algorithm is proposed to solve very large problem instances to obtain e-optimal solutions. The B%B algorithm and the extended B%B are evaluated for their performances against the solutions obtained by solving the MILP problem formulation using CPLEX solver through computational experiments. [Received 15 June 2017; Revised 2 February 2018; Accepted 10 March 2018]","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":"12 1","pages":"535-557"},"PeriodicalIF":1.9000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2018.10014670","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 4

Abstract

This paper studies the order acceptance and scheduling (OAS) problem in an identical parallel machine environment where orders are characterised by their revenues, processing times and weights. A mixed integer linear programming (MILP) model is presented for the problem with the objective of maximising the revenue minus the scheduling cost. The problem is NP- hard and a branch and bound (B%B) algorithm is developed to solve the problem. An extension of the B%B algorithm is proposed to solve very large problem instances to obtain e-optimal solutions. The B%B algorithm and the extended B%B are evaluated for their performances against the solutions obtained by solving the MILP problem formulation using CPLEX solver through computational experiments. [Received 15 June 2017; Revised 2 February 2018; Accepted 10 March 2018]
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有加权完成时间的并行机环境下的订单接受与调度
本文研究了具有收益、处理时间和权值特征的订单接收与调度问题。针对以收益减去调度成本为目标的调度问题,提出了一个混合整数线性规划模型。该问题是NP困难的,并提出了一种分支定界(B%B)算法来解决该问题。提出了B%B算法的扩展,用于求解非常大的问题实例,以获得e-最优解。通过计算实验,对B%B算法和扩展B%B算法的性能进行了评价,并与用CPLEX求解器求解MILP问题公式得到的解进行了比较。[2017年6月15日收到;2018年2月2日修订;接受2018年3月10日]
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
European Journal of Industrial Engineering
European Journal of Industrial Engineering 工程技术-工程:工业
CiteScore
2.60
自引率
20.00%
发文量
55
审稿时长
6 months
期刊介绍: EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.
期刊最新文献
A collaborative model for predictive maintenance of after-sales equipment based on digital twin An integrated two dimensional cutting stock and lot sizing problem with two criteria Third-party remanufacturing modes with integrated tax-subsidy policy Blockchain capabilities for supply chain management An integrated Markov chain model for the economic-statistical design of adaptive multivariate control charts and maintenance planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1