Study of Contract Change Order (CCO) on Implementation Time in Building Construction Project

T. Kamaludin, A. Rusdin, N. Nirmalawati
{"title":"Study of Contract Change Order (CCO) on Implementation Time in Building Construction Project","authors":"T. Kamaludin, A. Rusdin, N. Nirmalawati","doi":"10.37385/jaets.v4i2.1664","DOIUrl":null,"url":null,"abstract":"The aim of this research is to identify the main causes and effects of CCO in the construction of the Palu State Islamic University (IAIN) campus II building project for the Faculty of Tarbiyah and Teacher Training and the Faculty of Sharia and Islamic Economics Lecture Building. Tasks included conducting a field survey via a questionnaire and interviews with main parties; project owner, contractors and consultants who are directly related to the project. It was determined that the top three causes of CCO from project owner, contractor and consultant. The contractor has do CCO at the beginning of the project of 70% respondent, while consultant has changed contract order at mid-project implementation of 50% respondents and 70% at the end project implementation from the contractor. The results that are quite important from this study are the discovery of volume estimation errors and changes in work methods. Errors in estimating volumes are caused by the planning consultant's inaccuracy in planning so that there is a significant difference in volume from the initial contract with conditions in the field so that some work items experience an increase or decrease in volume","PeriodicalId":34350,"journal":{"name":"Journal of Applied Engineering and Technological Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Engineering and Technological Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37385/jaets.v4i2.1664","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

The aim of this research is to identify the main causes and effects of CCO in the construction of the Palu State Islamic University (IAIN) campus II building project for the Faculty of Tarbiyah and Teacher Training and the Faculty of Sharia and Islamic Economics Lecture Building. Tasks included conducting a field survey via a questionnaire and interviews with main parties; project owner, contractors and consultants who are directly related to the project. It was determined that the top three causes of CCO from project owner, contractor and consultant. The contractor has do CCO at the beginning of the project of 70% respondent, while consultant has changed contract order at mid-project implementation of 50% respondents and 70% at the end project implementation from the contractor. The results that are quite important from this study are the discovery of volume estimation errors and changes in work methods. Errors in estimating volumes are caused by the planning consultant's inaccuracy in planning so that there is a significant difference in volume from the initial contract with conditions in the field so that some work items experience an increase or decrease in volume
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建筑施工项目合同变更通知单实施时间研究
本研究的目的是确定CCO在帕卢州立伊斯兰大学(IAIN) Tarbiyah和教师培训学院以及伊斯兰教法和伊斯兰经济学讲堂的第二校区建筑项目建设中的主要原因和影响。任务包括通过问卷调查和与主要政党的访谈进行实地调查;与项目有直接关系的项目业主、承包商和顾问。结果表明,造成CCO的前三大原因分别为项目业主、承包商和顾问。70%的应答者在项目开始时承包商做了CCO,而50%的应答者在项目实施中期和70%的应答者在项目实施结束时顾问改变了承包商的合同订单。本研究的重要结果是体积估计误差的发现和工作方法的改变。估计工作量的错误是由于规划顾问在规划方面的不准确造成的,因此工作量与最初合同的工作量与实地情况有很大差异,因此一些工作项目的工作量会增加或减少
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.50
自引率
0.00%
发文量
0
审稿时长
4 weeks
期刊最新文献
Performance Analysis of Task Offloading in Mobile Edge Cloud Computing for Brain Tumor Classification Using Deep Learning Deep Feature Wise Attention Based Convolutional Neural Network for Covid-19 Detection Using Lung CT Scan Images Capacity Enhancement in D2D 5G Emerging Networks: A Survey Classification of Multiple Emotions in Indonesian Text Using The K-Nearest Neighbor Method Smart_Eye: A Navigation and Obstacle Detection for Visually Impaired People through Smart App
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1