Examining the maturity of South Africa’s government departments to implement the Infrastructure Delivery Management System (IDMS)

IF 0.6 Q4 MANAGEMENT Acta Structilia Pub Date : 2021-11-30 DOI:10.18820/24150487/as28i2.5
Progress Chigangacha, T. Haupt, B. Awuzie
{"title":"Examining the maturity of South Africa’s government departments to implement the Infrastructure Delivery Management System (IDMS)","authors":"Progress Chigangacha, T. Haupt, B. Awuzie","doi":"10.18820/24150487/as28i2.5","DOIUrl":null,"url":null,"abstract":"The purpose of this exploratory study is to examine the maturity of South Africa’s provincial government departments in engaging with the Infrastructure Delivery Management System (IDMS) towards facilitating effective infrastructure delivery. Furthermore, the study sought to formulate evidence-based interventions that could be utilised by these government departments to engender successful delivery of infrastructure assets and associated services to their beneficiaries. This research was descriptive and employed the quantitative research approach. Data was elicited from three provincial government departments in KwaZulu-Natal, South Africa. Structured maturity modelling questionnaires were deployed for data collection from the respondents. The emergent data was analysed using the Statistical Package for the Social Sciences (SPSS), Version 26. A One-Way ANOVA, aimed at enabling a comparative analysis of differences in the degree of maturity between the three provincial government departments that utilise the IDMS, was conducted. Results from the study indicate that the three departments (cases) had a maturity rating between 3 and 4, signifying well-defined and documented standard processes that can be improved over time. However, an IDMS-ready organisation would ideally have a maturity rating at level 5. In addition, the leadership dimension was found to be a driver of all other dimensions, where a high maturity level under this dimension directly correlates with improved maturity in the other dimensions. It is recommended that adequate management and leadership support is needed to improve organisational maturity in relation to IDMS implementation. The study was confined to KwaZulu-Natal, due to the short survey period for information gathering and data collection. The COVID-19 pandemic also had a great impact on the undertaking of some key research processes mostly affecting the research methodology, particularly during data collection. This study is the first of its kind in South Africa to assess the maturity of provincial government departments to implement the IDMS, which is indicative of an evaluation void gap.","PeriodicalId":42571,"journal":{"name":"Acta Structilia","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2021-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Structilia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18820/24150487/as28i2.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of this exploratory study is to examine the maturity of South Africa’s provincial government departments in engaging with the Infrastructure Delivery Management System (IDMS) towards facilitating effective infrastructure delivery. Furthermore, the study sought to formulate evidence-based interventions that could be utilised by these government departments to engender successful delivery of infrastructure assets and associated services to their beneficiaries. This research was descriptive and employed the quantitative research approach. Data was elicited from three provincial government departments in KwaZulu-Natal, South Africa. Structured maturity modelling questionnaires were deployed for data collection from the respondents. The emergent data was analysed using the Statistical Package for the Social Sciences (SPSS), Version 26. A One-Way ANOVA, aimed at enabling a comparative analysis of differences in the degree of maturity between the three provincial government departments that utilise the IDMS, was conducted. Results from the study indicate that the three departments (cases) had a maturity rating between 3 and 4, signifying well-defined and documented standard processes that can be improved over time. However, an IDMS-ready organisation would ideally have a maturity rating at level 5. In addition, the leadership dimension was found to be a driver of all other dimensions, where a high maturity level under this dimension directly correlates with improved maturity in the other dimensions. It is recommended that adequate management and leadership support is needed to improve organisational maturity in relation to IDMS implementation. The study was confined to KwaZulu-Natal, due to the short survey period for information gathering and data collection. The COVID-19 pandemic also had a great impact on the undertaking of some key research processes mostly affecting the research methodology, particularly during data collection. This study is the first of its kind in South Africa to assess the maturity of provincial government departments to implement the IDMS, which is indicative of an evaluation void gap.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
检视南非政府部门推行基建交付管理系统的成熟度
这项探索性研究的目的是检验南非省级政府部门在参与基础设施交付管理系统(IDMS)以促进有效的基础设施交付方面的成熟度。此外,该研究试图制定基于证据的干预措施,这些政府部门可以利用这些干预措施,成功地向受益人提供基础设施资产和相关服务。本研究为描述性研究,采用定量研究方法。数据来自南非夸祖鲁-纳塔尔省的三个省级政府部门。结构化成熟度建模问卷用于收集受访者的数据。使用社会科学统计软件包(SPSS)第26版对突发数据进行分析。进行了单向方差分析,旨在对使用IDMS的三个省政府部门之间的成熟度差异进行比较分析。研究结果表明,这三个部门(病例)的成熟度评级在3到4之间,这意味着定义明确且有文件记录的标准流程可以随着时间的推移而改进。然而,一个准备IDMS的组织理想的成熟度评级为5级。此外,领导力维度被发现是所有其他维度的驱动因素,在这个维度下的高成熟度水平与其他维度的成熟度提高直接相关。建议需要充分的管理和领导支持,以提高IDMS实施方面的组织成熟度。由于信息收集和数据收集的调查期较短,该研究仅限于夸祖鲁-纳塔尔。新冠肺炎大流行也对一些主要影响研究方法的关键研究过程产生了巨大影响,尤其是在数据收集期间。这项研究是南非首次评估省级政府部门实施IDMS的成熟度,这表明存在评估空白。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Acta Structilia
Acta Structilia MANAGEMENT-
自引率
14.30%
发文量
0
审稿时长
18 weeks
期刊最新文献
Optimisation of labour-intensive productivity for construction projects in Ghana Labour productivity in construction SMEs: Perspectives from South Africa Predictors of corruption among town planners: A Nigerian case study Impact of urban renewal changes on urban landscape identity: Case study of Kisumu City, Kenya A conceptual quality improvement protocol for Free State public works projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1