The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality

S. Husin, M. Mubarak, F. Fachrurrazi
{"title":"The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality","authors":"S. Husin, M. Mubarak, F. Fachrurrazi","doi":"10.13170/aijst.8.2.13281","DOIUrl":null,"url":null,"abstract":"The construction involves a series of activities that possibly face problems or risks. The risk probability is an uncertain condition that results in a negative impact on the project objectives. Threats can come from the resources factor in a construction project, such as labour, materials, and equipment. The handling of risks in construction work needs to be further reviewed. It is to find risk factors and risk variables contributing to high risk to achieve the quality objectives of construction implementation. The purpose of this study was to analyze the most significant risk towards the quality of construction associated with the condition of the Province of Aceh during 2000-2015. The situation is classified in three periods, namely political conflict (2000-2004 as Period I), rehabilitation and reconstruction (2005-2009 as Period II), and post-rehabilitation and reconstruction (2010-2015 as Period III). Dataset is collected using questionnaires to 15 large qualified contractor companies to capture construction quality information. The risk significance identified based on Risk Importance Index (RII) for frequency and severity of factors and variables. There are 7 variables for labour resources, 10 variables for material resources, and 17 variables for equipment resources. The quality of construction mostly affected by the labour resources factors in Period I and Period III. The risk comes from the variable discipline of workers who are not good (A3). For Period II, the lack of labour capacity (A2) variable become as the most significant risk.","PeriodicalId":7128,"journal":{"name":"Aceh International Journal of Science and Technology","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aceh International Journal of Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13170/aijst.8.2.13281","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The construction involves a series of activities that possibly face problems or risks. The risk probability is an uncertain condition that results in a negative impact on the project objectives. Threats can come from the resources factor in a construction project, such as labour, materials, and equipment. The handling of risks in construction work needs to be further reviewed. It is to find risk factors and risk variables contributing to high risk to achieve the quality objectives of construction implementation. The purpose of this study was to analyze the most significant risk towards the quality of construction associated with the condition of the Province of Aceh during 2000-2015. The situation is classified in three periods, namely political conflict (2000-2004 as Period I), rehabilitation and reconstruction (2005-2009 as Period II), and post-rehabilitation and reconstruction (2010-2015 as Period III). Dataset is collected using questionnaires to 15 large qualified contractor companies to capture construction quality information. The risk significance identified based on Risk Importance Index (RII) for frequency and severity of factors and variables. There are 7 variables for labour resources, 10 variables for material resources, and 17 variables for equipment resources. The quality of construction mostly affected by the labour resources factors in Period I and Period III. The risk comes from the variable discipline of workers who are not good (A3). For Period II, the lack of labour capacity (A2) variable become as the most significant risk.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
人工、材料、设备因素对建设工程质量的重大风险
施工涉及一系列可能面临问题或风险的活动。风险概率是一种不确定的情况,会对项目目标产生负面影响。威胁可能来自建筑项目中的资源因素,如劳动力、材料和设备。建筑工程中的风险处理需要进一步审查。寻找造成高风险的风险因素和风险变量,实现施工实施的质量目标。本研究的目的是分析2000-2015年期间与亚齐省状况相关的施工质量最重大风险。局势分为三个时期,即政治冲突(2000-2004年为第一阶段)、恢复和重建(2005-2009年为第二阶段)以及恢复和重建后(2010-2015年为第三阶段)。数据集是通过对15家大型合格承包商公司的问卷调查收集的,以获取施工质量信息。根据因素和变量的频率和严重程度的风险重要性指数(RII)确定的风险显著性。劳动力资源有7个变量,材料资源有10个变量,设备资源有17个变量。施工质量主要受第一期和第三期劳动力资源因素的影响。风险来自于不好的工人的可变纪律(A3)。在第二阶段,劳动力缺乏(A2)变量成为最重大的风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
19
审稿时长
8 weeks
期刊最新文献
Structural Health Monitoring by Identification Dynamic Properties and Load Rating Factor at Multi-span Prestressed Concrete Girder Bridge Isotherm and Kinetic Adsorption of Cadmium (Cd) onto Biosorbent Made from Kepok Banana Peel (Musa Acuminata balbisian): the Effect of Activator Type and Biosorbent Dosage Life Cycle Cost Analysis and Payback Period of 12-kW Wind Turbine for a Remote Telecommunications Base Station Simulation of Multi Reservoir Operation Rules with Interconnected Tunnel and Water Transfer Simple Technology of Material Physics of Groundwater Conservation in Dealing with Climate Change in Disaster Areas of North Sumatra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1