Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project

IF 2.1 Q2 CONSTRUCTION & BUILDING TECHNOLOGY International Journal of Building Pathology and Adaptation Pub Date : 2023-07-17 DOI:10.1108/ijbpa-11-2022-0184
Nadira Islam Nila, J. Akter, M. M. Hossain
{"title":"Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project","authors":"Nadira Islam Nila, J. Akter, M. M. Hossain","doi":"10.1108/ijbpa-11-2022-0184","DOIUrl":null,"url":null,"abstract":"PurposeChange orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.Design/methodology/approachTo assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.FindingsThis study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.Originality/valueThe developed policies aid to mitigate the effect of change orders on labor productivity.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2023-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Building Pathology and Adaptation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijbpa-11-2022-0184","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeChange orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.Design/methodology/approachTo assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.FindingsThis study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.Originality/valueThe developed policies aid to mitigate the effect of change orders on labor productivity.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
变更顺序对劳动生产率的影响,以及通过使用系统动态建模制定政策来缓解这种影响:一个建筑项目中的案例研究
目的变更单是建筑项目中常见的情况。变更单会间接影响劳动生产率,从而导致建筑项目的完工大幅延迟。变更单会造成难以描述、建立和说明承包商和分包商的劳动生产率损失。本研究旨在观察变更单对劳动生产率的影响,并制定减轻其不利影响的方法。设计/方法/方法为了评估变更单对生产力水平的影响,本研究开发了一个系统动态模型,并制定了抵消这些负面影响的方法。然后使用所建立的技术来控制变更单对劳动生产率和项目时间的影响。最后,选择了KUET大厅扩建的案例研究,并实现了所开发的模型和原则。发现这项研究表明,如果项目交付日期被设定,并且经常发生变更单,劳动生产率将受到影响。通过适当的监测和补充管理技术,可以通过延长项目来减少这种情况。独创性/价值制定的政策有助于减轻变更单对劳动生产率的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.80
自引率
18.20%
发文量
76
期刊介绍: The International Journal of Building Pathology and Adaptation publishes findings on contemporary and original research towards sustaining, maintaining and managing existing buildings. The journal provides an interdisciplinary approach to the study of buildings, their performance and adaptation in order to develop appropriate technical and management solutions. This requires an holistic understanding of the complex interactions between the materials, components, occupants, design and environment, demanding the application and development of methodologies for diagnosis, prognosis and treatment in this multidisciplinary area. With rapid technological developments, a changing climate and more extreme weather, coupled with developing societal demands, the challenges to the professions responsible are complex and varied; solutions need to be rigorously researched and tested to navigate the dynamic context in which today''s buildings are to be sustained. Within this context, the scope and coverage of the journal incorporates the following indicative topics: • Behavioural and human responses • Building defects and prognosis • Building adaptation and retrofit • Building conservation and restoration • Building Information Modelling (BIM) • Building and planning regulations and legislation • Building technology • Conflict avoidance, management and disputes resolution • Digital information and communication technologies • Education and training • Environmental performance • Energy management • Health, safety and welfare issues • Healthy enclosures • Innovations and innovative technologies • Law and practice of dilapidation • Maintenance and refurbishment • Materials testing • Policy formulation and development • Project management • Resilience • Structural considerations • Surveying methodologies and techniques • Sustainability and climate change • Valuation and financial investment
期刊最新文献
Evaluating social media in architecture, engineering, construction and operation industry: a Nigerian perspective on applications and benefits Adequacy of defects liability periods for public construction projects in Ghana Impact of AEC project organizational design on the mental health of project management practitioners (PMPs) in Australia Managing construction project risks in turbulent times: a stakeholders perspective Performance of concrete containing waste demolished concrete powder as a partial substitute for cement
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1