T. Cox, S. Wolosoff, Clifford Shum, Taraneh Nik-Khah
{"title":"A tale of two contaminants: stark differences in the response of N and P to urban lake mitigation efforts","authors":"T. Cox, S. Wolosoff, Clifford Shum, Taraneh Nik-Khah","doi":"10.2166/h2oj.2022.025","DOIUrl":null,"url":null,"abstract":"\n A constructed in-lake water quality mitigation system has proven itself to be effective at reducing Machado Lake phosphorus (P) levels, but ineffective at reducing nitrogen (N) levels. A combination of lake sediment dredging and capping, oxygenation, and a recirculating wetland have reduced lake water column P levels by nearly 50%, as compared to pre-project levels. Key to this result has been the dampening of seasonal P recycling in the sediments. A new lake water quality numerical model is presented, with applications to both pre- and post-project conditions. Model auditing has revealed very good results with respect to predicting mitigation impacts on P but poor results with respect to predicting the performance, or lack thereof, of the N mitigation system. Model sensitivity analyses indicate that the P reductions are primarily attributable to the sediment dredging and capping. Conversely, seasonal data, supported by modeling, suggest that the poor performance of the N mitigation system may be attributable to incomplete removal, or sequestration, of sediment N mass during dredging and/or a lack of impact from the oxygenation system. Future mitigation efforts for the lake should focus on reducing the substantial watershed nutrient loads to the lake and further in-lake P inactivation.","PeriodicalId":36060,"journal":{"name":"H2Open Journal","volume":" ","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"H2Open Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2166/h2oj.2022.025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"WATER RESOURCES","Score":null,"Total":0}
引用次数: 0
Abstract
A constructed in-lake water quality mitigation system has proven itself to be effective at reducing Machado Lake phosphorus (P) levels, but ineffective at reducing nitrogen (N) levels. A combination of lake sediment dredging and capping, oxygenation, and a recirculating wetland have reduced lake water column P levels by nearly 50%, as compared to pre-project levels. Key to this result has been the dampening of seasonal P recycling in the sediments. A new lake water quality numerical model is presented, with applications to both pre- and post-project conditions. Model auditing has revealed very good results with respect to predicting mitigation impacts on P but poor results with respect to predicting the performance, or lack thereof, of the N mitigation system. Model sensitivity analyses indicate that the P reductions are primarily attributable to the sediment dredging and capping. Conversely, seasonal data, supported by modeling, suggest that the poor performance of the N mitigation system may be attributable to incomplete removal, or sequestration, of sediment N mass during dredging and/or a lack of impact from the oxygenation system. Future mitigation efforts for the lake should focus on reducing the substantial watershed nutrient loads to the lake and further in-lake P inactivation.