{"title":"A new mining method for reopening the opencast mine of Kef Essennoun","authors":"M. C. Mezam, M. A. Bachar Assed, M. Ould Hamou, S. Narsis, A. Benselhoub","doi":"10.33271/nvngu/2023-4/026","DOIUrl":null,"url":null,"abstract":"Purpose. To treat the stability problem of the phosphate Kef Essennoun quarry in the mining field of Jebel Onk located in the Northeastern part of Algeria. Methodology. To achieve these objectives, we started by monitoring the unstable area, using two monitoring systems: control stations and inclinometer. We then carried out a digital assessment of the Northwestern edge stability of the quarry under the current operating conditions of exploitation. After that, we proposed a new operating plan for the reopening of the depot under the required security conditions. At the end, we carried out an assessment of the edge stability, as the work to reopen and develop the Kef Essennoun quarry progressed. Findings. The results show that, under the current operating conditions of exploitation, the Northwestern edge of the Kef Essennoun quarry is unstable (FS < 1). The backfilling of the pilot pit of the mine, lead to the assurance of the mine walls stability, by increasing the values of safety factors with a rate of more than 30 %. Originality. The backfilling of the pilot pit of the mine and the resumption of top-down mining exploitation will ensure the stability of the quarry during and after the operating exploitation mining. Practical value. The study of the stability of the embankments bleachers, the edges of the quarries and the facings of the slag heaps during the open pit mining of useful ores deposits is an essential step that must be done gradually according to the development of mining works to guarantee the safety of personnel, materials, reserves and the environment.","PeriodicalId":19101,"journal":{"name":"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/nvngu/2023-4/026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose. To treat the stability problem of the phosphate Kef Essennoun quarry in the mining field of Jebel Onk located in the Northeastern part of Algeria. Methodology. To achieve these objectives, we started by monitoring the unstable area, using two monitoring systems: control stations and inclinometer. We then carried out a digital assessment of the Northwestern edge stability of the quarry under the current operating conditions of exploitation. After that, we proposed a new operating plan for the reopening of the depot under the required security conditions. At the end, we carried out an assessment of the edge stability, as the work to reopen and develop the Kef Essennoun quarry progressed. Findings. The results show that, under the current operating conditions of exploitation, the Northwestern edge of the Kef Essennoun quarry is unstable (FS < 1). The backfilling of the pilot pit of the mine, lead to the assurance of the mine walls stability, by increasing the values of safety factors with a rate of more than 30 %. Originality. The backfilling of the pilot pit of the mine and the resumption of top-down mining exploitation will ensure the stability of the quarry during and after the operating exploitation mining. Practical value. The study of the stability of the embankments bleachers, the edges of the quarries and the facings of the slag heaps during the open pit mining of useful ores deposits is an essential step that must be done gradually according to the development of mining works to guarantee the safety of personnel, materials, reserves and the environment.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Kef essenoun露天矿重新开采的新采矿方法
意图处理阿尔及利亚东北部Jebel Onk矿区磷酸盐Kef Essennoun采石场的稳定性问题。方法论为了实现这些目标,我们首先对不稳定区域进行监测,使用两个监测系统:控制站和倾角仪。然后,我们对当前开采条件下采石场西北边缘的稳定性进行了数字评估。之后,我们提出了一项新的运营计划,在必要的安全条件下重新开放仓库。最后,随着Kef Essennoun采石场重新开放和开发工作的进展,我们对边缘稳定性进行了评估。调查结果。结果表明,在目前的开采条件下,Kef Essennoun采石场的西北边缘是不稳定的(FS<1)。矿井先导坑的回填,通过以超过30的比率增加安全系数的值,确保了矿井壁的稳定性 %. 独创性矿山先导坑的回填和自上而下的采矿开采的恢复将确保采石场在运营开采开采期间和之后的稳定性。实用价值。对有用矿床露天开采过程中路堤露天看台、采石场边缘和矿渣堆表面的稳定性进行研究是一个重要的步骤,必须根据采矿工程的发展逐步进行,以确保人员、材料、储量和环境的安全。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.70
自引率
0.00%
发文量
148
期刊最新文献
Influence of ice structure on vitability of frozen sand-water and sand-clay mixtures Scientific bases and peculiarities of conversion of CHPP anthracite boilers to sub-bituminous coal combustion Enhancement of sorption of the azoic dye (Azucryl Red) by natural and calcined hyper-aluminous kaolins Improvement of the methodology for calculating the expected drilling speed with PDC chisels Influence of the rock mass structure and the blasting technique on blast results in the Heliopolis quarry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1