Supply Chain Risk Mapping at ABC Cement Plant in Aceh, Indonesia

R. D. Lufika, H. Sastra, P. D. Sentia, I. Ilyas, I. Hasanuddin
{"title":"Supply Chain Risk Mapping at ABC Cement Plant in Aceh, Indonesia","authors":"R. D. Lufika, H. Sastra, P. D. Sentia, I. Ilyas, I. Hasanuddin","doi":"10.13170/aijst.11.2.23457","DOIUrl":null,"url":null,"abstract":"Supply Chain Risk Management is an industry collaboration work with partners in the supply chain system to implement a risk management process in dealing with the emergence of risks and uncertainties caused by logistics activities or other resources in the supply chain. Every industry deals with risk. This study aims to identify, classify, and mapping supply chain activities and their risks. At the initial stage, the identification of supply chain events is done by doing interviews and brainstorming. Then, these events are portrayed in the supply chain map. Then, the risk identification stage used a rating scale to determine the level of likelihood and consequence based on three SCOR elements. There are 40 risk events in this study which are 13 risk events in the source section, 19 risk events in the make section, and eight risk events in the delivery section. Finally, it is necessary to calculate the value of the Risk Priority Index (RPI). The RPI is the basis of the risk mapping stage. The risk map will show the urgency to treat each risk event.","PeriodicalId":7128,"journal":{"name":"Aceh International Journal of Science and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aceh International Journal of Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13170/aijst.11.2.23457","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Supply Chain Risk Management is an industry collaboration work with partners in the supply chain system to implement a risk management process in dealing with the emergence of risks and uncertainties caused by logistics activities or other resources in the supply chain. Every industry deals with risk. This study aims to identify, classify, and mapping supply chain activities and their risks. At the initial stage, the identification of supply chain events is done by doing interviews and brainstorming. Then, these events are portrayed in the supply chain map. Then, the risk identification stage used a rating scale to determine the level of likelihood and consequence based on three SCOR elements. There are 40 risk events in this study which are 13 risk events in the source section, 19 risk events in the make section, and eight risk events in the delivery section. Finally, it is necessary to calculate the value of the Risk Priority Index (RPI). The RPI is the basis of the risk mapping stage. The risk map will show the urgency to treat each risk event.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印尼亚齐ABC水泥厂供应链风险图
供应链风险管理是与供应链系统中的合作伙伴一起实施风险管理过程,以应对由物流活动或供应链中的其他资源引起的风险和不确定性的出现。每个行业都面临风险。本研究旨在识别、分类和绘制供应链活动及其风险。在初始阶段,供应链事件的识别是通过访谈和头脑风暴来完成的。然后,将这些事件描绘在供应链图中。然后,风险识别阶段使用评分量表来确定基于三个SCOR元素的可能性和后果水平。本研究共涉及40个风险事件,其中来源部分风险事件13个,制造部分风险事件19个,交付部分风险事件8个。最后,需要计算风险优先指数(RPI)的值。RPI是风险映射阶段的基础。风险图将显示处理每个风险事件的紧迫性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
19
审稿时长
8 weeks
期刊最新文献
Structural Health Monitoring by Identification Dynamic Properties and Load Rating Factor at Multi-span Prestressed Concrete Girder Bridge Isotherm and Kinetic Adsorption of Cadmium (Cd) onto Biosorbent Made from Kepok Banana Peel (Musa Acuminata balbisian): the Effect of Activator Type and Biosorbent Dosage Life Cycle Cost Analysis and Payback Period of 12-kW Wind Turbine for a Remote Telecommunications Base Station Simulation of Multi Reservoir Operation Rules with Interconnected Tunnel and Water Transfer Simple Technology of Material Physics of Groundwater Conservation in Dealing with Climate Change in Disaster Areas of North Sumatra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1