Solution algorithms to minimise the total family tardiness for job shop scheduling with job families

IF 1.4 4区 工程技术 Q3 ENGINEERING, INDUSTRIAL European Journal of Industrial Engineering Pub Date : 2018-02-19 DOI:10.1504/EJIE.2018.089876
Jae-Min Yu, Dong Ho Lee
{"title":"Solution algorithms to minimise the total family tardiness for job shop scheduling with job families","authors":"Jae-Min Yu, Dong Ho Lee","doi":"10.1504/EJIE.2018.089876","DOIUrl":null,"url":null,"abstract":"This study addresses a job shop scheduling problem in which jobs are grouped into job families, but they are processed individually using their distinct routings. Unlike the previous studies, we consider a due-date-based objective of minimising the total family tardiness, i.e., sum of positive deviations between the due-dates and the completion times of job families. A mixed integer programming model is developed to represent the problem mathematically. Then, an optimal algorithm is proposed using the branch and bound technique while developing a job family-based lower bound. For practical applications up to large sized instances, two types of heuristics, modified shifting bottleneck and priority scheduling algorithms, are also proposed. To test the performances of the three types of solution algorithms, computational experiments were done on a number of test instances and the results are reported. [Received: 10 September 2016; Revised: 28 February 2017; Revised: 6 June 2017; Accepted: 22 August 2017]","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":"12 1","pages":"1-23"},"PeriodicalIF":1.4000,"publicationDate":"2018-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/EJIE.2018.089876","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2018.089876","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 5

Abstract

This study addresses a job shop scheduling problem in which jobs are grouped into job families, but they are processed individually using their distinct routings. Unlike the previous studies, we consider a due-date-based objective of minimising the total family tardiness, i.e., sum of positive deviations between the due-dates and the completion times of job families. A mixed integer programming model is developed to represent the problem mathematically. Then, an optimal algorithm is proposed using the branch and bound technique while developing a job family-based lower bound. For practical applications up to large sized instances, two types of heuristics, modified shifting bottleneck and priority scheduling algorithms, are also proposed. To test the performances of the three types of solution algorithms, computational experiments were done on a number of test instances and the results are reported. [Received: 10 September 2016; Revised: 28 February 2017; Revised: 6 June 2017; Accepted: 22 August 2017]
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有作业族的作业车间调度中最小化总作业族延迟的求解算法
本文研究了一个作业车间调度问题,其中作业被分组到作业族中,但它们使用各自不同的路由进行单独处理。与之前的研究不同,我们考虑了一个基于截止日期的目标,即最小化总家庭延迟,即工作家庭的截止日期和完成时间之间的正偏差之和。建立了一个混合整数规划模型,对该问题进行数学表示。然后,利用分支定界技术提出了一种优化算法,同时建立了基于作业族的下界。对于大型实例的实际应用,还提出了两种启发式算法,即修正移动瓶颈算法和优先级调度算法。为了测试三种求解算法的性能,在多个测试实例上进行了计算实验,并报告了结果。[收稿日期:2016年9月10日;修订日期:2017年2月28日;修订日期:2017年6月6日;录用日期:2017年8月22日]
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
European Journal of Industrial Engineering
European Journal of Industrial Engineering 工程技术-工程:工业
CiteScore
2.60
自引率
20.00%
发文量
55
审稿时长
6 months
期刊介绍: EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.
期刊最新文献
A collaborative model for predictive maintenance of after-sales equipment based on digital twin An integrated two dimensional cutting stock and lot sizing problem with two criteria Third-party remanufacturing modes with integrated tax-subsidy policy Blockchain capabilities for supply chain management An integrated Markov chain model for the economic-statistical design of adaptive multivariate control charts and maintenance planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1