Pre-design CSFs (critical success factors) of building projects for Dubai's development boom

IF 1.9 Q3 ENGINEERING, CIVIL Built Environment Project and Asset Management Pub Date : 2023-04-21 DOI:10.1108/bepam-09-2022-0144
S. Abdalla, E. Mushtaha, M. Rashid, A. Opoku, Rawan Hamad, F. Dweiri, A. Elmualim
{"title":"Pre-design CSFs (critical success factors) of building projects for Dubai's development boom","authors":"S. Abdalla, E. Mushtaha, M. Rashid, A. Opoku, Rawan Hamad, F. Dweiri, A. Elmualim","doi":"10.1108/bepam-09-2022-0144","DOIUrl":null,"url":null,"abstract":"PurposeThis paper aims to identify the pre-design critical success factors CSFs pertaining to different types of construction projects in the rapidly growing city of Dubai, by adopting one of the multi-criteria decision-making (MCDM) tools, analytic hierarchy process (AHP).Design/methodology/approachA mapping process was utilized to filter and categorize CSFs gathered from a literature review. A total of 5 main and 27 sub-main criteria were derived following RIBA's Plan of Work 2020 (Royal Institute of British Architects). A questionnaire was distributed among experts in the construction industry to assess the development in vicinity of the Sheikh Zayed Road (SZR). An analysis was conducted to prioritize the CSFs as per experts' judgment.FindingsAccording to the experts' combined judgment, CSFs linked to client requirements (CR) are the most significant at 22.9% priority weight. Overall project review (OPR), project team (PT), project preparation (PP), previous projects feedback and experience (PPF) success factors achieved 21.4, 19.5, 18.9 and 17.2%, respectively. Within CR, sub-CSFs of client consultation and acceptance (CCA), responsibly matrix for stakeholders (RM), client track record (CTR) and client level of service (CLS) were prioritized by the experts.Research limitations/implicationsThis work was carried out by respondents based in UAE only, and focused on one urban stretch of Dubai, this could be replicated by employing experts from other countries and other case study areas within Dubai.Practical implicationsThis study would significantly have an impact on the education of current and future project managers, planners, engineers, architects and, most importantly, decision-makers on helpful pre-design strategies for enhancing their project success. This research could assist, direct and educate management, as the management provides/manages the necessary resources for projects. Furthermore, management also has the authority to choose project leaders/consultants that will make the project successful.Social implicationsConsolidating Dubai's phenomenal growth requires prioritizing socio-economic strategies in future development projects at the pre-design and pre-construction stage, which will improve the city's business environment and the quality of life for Dubai's residents. This opens up fresh possibilities over the next few years for integrating robust procedures for successful execution, monitoring and evaluation of future construction developments from the outset.Originality/valueAlthough many studies have identified various factors as important for successful building projects, few appear to have done a complete analysis using pre-design criteria to systematically categorize professional views on the relative relevance of CSFs. There is a lack in research examining the factors that led to Dubai's successful construction projects. This study attempts to bridge this gap and provide a prioritized framework reference model to assist project/asset managers and decision-makers.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-04-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-09-2022-0144","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeThis paper aims to identify the pre-design critical success factors CSFs pertaining to different types of construction projects in the rapidly growing city of Dubai, by adopting one of the multi-criteria decision-making (MCDM) tools, analytic hierarchy process (AHP).Design/methodology/approachA mapping process was utilized to filter and categorize CSFs gathered from a literature review. A total of 5 main and 27 sub-main criteria were derived following RIBA's Plan of Work 2020 (Royal Institute of British Architects). A questionnaire was distributed among experts in the construction industry to assess the development in vicinity of the Sheikh Zayed Road (SZR). An analysis was conducted to prioritize the CSFs as per experts' judgment.FindingsAccording to the experts' combined judgment, CSFs linked to client requirements (CR) are the most significant at 22.9% priority weight. Overall project review (OPR), project team (PT), project preparation (PP), previous projects feedback and experience (PPF) success factors achieved 21.4, 19.5, 18.9 and 17.2%, respectively. Within CR, sub-CSFs of client consultation and acceptance (CCA), responsibly matrix for stakeholders (RM), client track record (CTR) and client level of service (CLS) were prioritized by the experts.Research limitations/implicationsThis work was carried out by respondents based in UAE only, and focused on one urban stretch of Dubai, this could be replicated by employing experts from other countries and other case study areas within Dubai.Practical implicationsThis study would significantly have an impact on the education of current and future project managers, planners, engineers, architects and, most importantly, decision-makers on helpful pre-design strategies for enhancing their project success. This research could assist, direct and educate management, as the management provides/manages the necessary resources for projects. Furthermore, management also has the authority to choose project leaders/consultants that will make the project successful.Social implicationsConsolidating Dubai's phenomenal growth requires prioritizing socio-economic strategies in future development projects at the pre-design and pre-construction stage, which will improve the city's business environment and the quality of life for Dubai's residents. This opens up fresh possibilities over the next few years for integrating robust procedures for successful execution, monitoring and evaluation of future construction developments from the outset.Originality/valueAlthough many studies have identified various factors as important for successful building projects, few appear to have done a complete analysis using pre-design criteria to systematically categorize professional views on the relative relevance of CSFs. There is a lack in research examining the factors that led to Dubai's successful construction projects. This study attempts to bridge this gap and provide a prioritized framework reference model to assist project/asset managers and decision-makers.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
迪拜发展热潮中建筑项目的预设计csf(关键成功因素)
本文旨在通过采用多标准决策(MCDM)工具之一的层次分析法(AHP),确定与快速发展的迪拜城市中不同类型的建设项目相关的设计前关键成功因素。设计/方法/方法采用映射过程对从文献综述中收集的csf进行筛选和分类。根据RIBA的2020年工作计划(英国皇家建筑师学会),共有5个主要标准和27个次主要标准。向建筑行业的专家分发了一份调查表,以评估Sheikh Zayed路附近的发展情况。根据专家的判断,进行了排序分析。结果根据专家的综合判断,与客户需求相关的CSFs (CR)最重要,优先权重为22.9%。总体项目评审(OPR)、项目团队(PT)、项目准备(PP)、以往项目反馈和经验(PPF)成功因素分别达到21.4%、19.5%、18.9%和17.2%。在CR中,专家们优先考虑了客户咨询和接受(CCA)、利益相关者负责任矩阵(RM)、客户跟踪记录(CTR)和客户服务水平(CLS)的子csf。研究的局限性/意义:这项工作仅由阿联酋的受访者进行,并专注于迪拜的一个城市区域,这可以通过雇用来自其他国家和迪拜其他案例研究领域的专家来复制。实际意义本研究将对当前和未来的项目经理、规划师、工程师、建筑师,最重要的是对决策者的前期设计策略的教育产生重大影响,以提高他们的项目成功。这项研究可以协助、指导和教育管理层,因为管理层为项目提供/管理必要的资源。此外,管理层也有权选择项目负责人/顾问,使项目取得成功。社会意义巩固迪拜的显著增长需要在设计和施工前阶段优先考虑未来发展项目的社会经济战略,这将改善城市的商业环境和迪拜居民的生活质量。这为今后几年整合强有力的程序,从一开始就成功地执行、监测和评估未来的建筑发展开辟了新的可能性。原创性/价值虽然许多研究已经确定了成功建筑项目的各种重要因素,但似乎很少有研究使用设计前标准进行完整的分析,系统地分类有关CSFs相对相关性的专业观点。对于导致迪拜建筑项目成功的因素,缺乏研究。本研究试图弥合这一差距,并提供一个优先的框架参考模型,以帮助项目/资产经理和决策者。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
期刊最新文献
Application of lean principles for building refurbishment projects in Sri Lanka Unraveling consumer behavioral intentions to adopt solar water heaters in India using UTAUT model Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects Benefits and challenges of implementing green building development in Nigeria Developing a framework for building information modelling (BIM) adoption in New Zealand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1