PENINGKATAN EFISIENSI BIAYA PEMBANGUNAN GEDUNG BERTINGKAT DENGAN APLIKASI BUILDING INFORMATION MODELING (BIM) 5D

Faqih Nadiya Umam, Erizal Erizal, H. Putra
{"title":"PENINGKATAN EFISIENSI BIAYA PEMBANGUNAN GEDUNG BERTINGKAT DENGAN APLIKASI BUILDING INFORMATION MODELING (BIM) 5D","authors":"Faqih Nadiya Umam, Erizal Erizal, H. Putra","doi":"10.29103/tj.v12i1.704","DOIUrl":null,"url":null,"abstract":"Most construction companies in Indonesia currently still use conventional applications that are carried out separately. The consequences that are often found from the use of fragmented conventional applications include construction waste and delays in the information that cause cost and time inefficiencies. Therefore, an integrated system is needed to answer these problems. One technology that has emerged to answer these problems is Building Information Modeling (BIM). This research was conducted by modeling simulations and calculations to evaluate the accuracy and cost-efficiency of using the BIM 5D application compared to conventional methods in rebar and concrete work. The project simulation was carried out on a 16-floor apartment. As a result, the use of the BIM 5D application can reduce labor costs by Rp171,989,939.00 or save 6.33%. The efficiency values of fc'30 MPa concrete work, fc'35 MPa concrete, and rebar work are 7.21%, 10.87%, and 5.98%, respectively. The total cost-efficiency obtained is Rp406,697,000.00. This cost is huge compared to the investment cost of the BIM 5D application for Rp127,000,000.00.","PeriodicalId":52898,"journal":{"name":"Teras Jurnal Jurnal Teknik Sipil","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teras Jurnal Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29103/tj.v12i1.704","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Most construction companies in Indonesia currently still use conventional applications that are carried out separately. The consequences that are often found from the use of fragmented conventional applications include construction waste and delays in the information that cause cost and time inefficiencies. Therefore, an integrated system is needed to answer these problems. One technology that has emerged to answer these problems is Building Information Modeling (BIM). This research was conducted by modeling simulations and calculations to evaluate the accuracy and cost-efficiency of using the BIM 5D application compared to conventional methods in rebar and concrete work. The project simulation was carried out on a 16-floor apartment. As a result, the use of the BIM 5D application can reduce labor costs by Rp171,989,939.00 or save 6.33%. The efficiency values of fc'30 MPa concrete work, fc'35 MPa concrete, and rebar work are 7.21%, 10.87%, and 5.98%, respectively. The total cost-efficiency obtained is Rp406,697,000.00. This cost is huge compared to the investment cost of the BIM 5D application for Rp127,000,000.00.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
5D信息模型应用实现的效率要求
印尼的大多数建筑公司目前仍在使用单独进行的传统应用程序。使用零散的传统应用程序通常会产生的后果包括建筑浪费和信息延迟,导致成本和时间效率低下。因此,需要一个综合系统来解决这些问题。解决这些问题的一种技术是建筑信息建模(BIM)。本研究通过建模模拟和计算进行,以评估与钢筋和混凝土工程中的传统方法相比,使用BIM 5D应用程序的准确性和成本效益。项目模拟是在一个16层的公寓中进行的。因此,使用BIM 5D应用程序可以减少劳动力成本171989939.00卢比或节省6.33%。fc’30MPa混凝土工程、fc’35MPa混凝土工程和钢筋工程的效率值分别为7.21%、10.87%和5.98%。获得的总成本效益为406697000.00卢比。与BIM 5D应用程序127000000.00卢比的投资成本相比,这一成本是巨大的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
52
审稿时长
6 weeks
期刊最新文献
Perencanaan Bangunan Pelindung Pantai Di Desa Pesisir Besuki Kabupaten Situbondo Evaluasi Perkerasan Menggunakan Metode Bina Marga 1990 Dengan Metode Pavement Condition Index (PCI) Dalam Penentuan Pekerjaan Preservasi Jalan Kajian Limpasan Permukaan pada DAS Mampang Menggunakan Model SWAT Analisa Daya Dukung Tiang Pancang Berdasarkan Hasil Kalendering Pada Proyek Simpang Susun Romokalisari Zona 2 STA 0+900 Optimasi Penggunaan Agregat Kasar Gabungan Pada Campuran Beton Dengan Tambahan Superplasticizer
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1