Wedge Failure Analysis and Remedial Measures in Large Unlined Rock Cavern: a Case Study

IF 1.2 4区 工程技术 Q3 MINING & MINERAL PROCESSING Archives of Mining Sciences Pub Date : 2023-07-20 DOI:10.24425/AMS.2018.124987
T. Bhatkar, A. Usmani, A. Mandal, A. Nanda, Analiza Pęknięcia, Klina W Dużej, Nieobudowanej Komorze Skalnej, Oraz Podjęte, Kroki Naprawcze, Studium Przypadku
{"title":"Wedge Failure Analysis and Remedial Measures in Large Unlined Rock Cavern: a Case Study","authors":"T. Bhatkar, A. Usmani, A. Mandal, A. Nanda, Analiza Pęknięcia, Klina W Dużej, Nieobudowanej Komorze Skalnej, Oraz Podjęte, Kroki Naprawcze, Studium Przypadku","doi":"10.24425/AMS.2018.124987","DOIUrl":null,"url":null,"abstract":"This article presents a case study of a large wedge failure. It took place during excavation of the last bench of storage cavern with an approximate dimension of 80 m long having a depth of 8 m. The adopted intervention followed a structured approach, which included immediate rock support, geotechnical and geological investigations in the failure zone and design modifications. Back analyses of the failure zone were also carried out to assess design parameters with observed geological conditions. Re assessment in the failure zone was carried out using modified design parameters, which included shorter benches, rock support installation schemes such as longer rock bolts, reinforced ribs of shotcrete and reduced construction advances. Geotechnical monitoring in and around failure zone were carried out for recording any alarming movements in the rock mass. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least one week, the frequency of subsequent monitoring can be decided. In most cases the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes. The paper discusses the failure, investigation, cause, assessment and remedial measures to complete the construction of cavern.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Mining Sciences","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.24425/AMS.2018.124987","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 1

Abstract

This article presents a case study of a large wedge failure. It took place during excavation of the last bench of storage cavern with an approximate dimension of 80 m long having a depth of 8 m. The adopted intervention followed a structured approach, which included immediate rock support, geotechnical and geological investigations in the failure zone and design modifications. Back analyses of the failure zone were also carried out to assess design parameters with observed geological conditions. Re assessment in the failure zone was carried out using modified design parameters, which included shorter benches, rock support installation schemes such as longer rock bolts, reinforced ribs of shotcrete and reduced construction advances. Geotechnical monitoring in and around failure zone were carried out for recording any alarming movements in the rock mass. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least one week, the frequency of subsequent monitoring can be decided. In most cases the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes. The paper discusses the failure, investigation, cause, assessment and remedial measures to complete the construction of cavern.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
大型无衬砌岩洞楔块破坏分析及修复措施研究
本文介绍了一个大型楔块破坏的案例研究。它发生在储存洞穴最后一个台阶的开挖过程中,该台阶的尺寸约为80米长,深度为8米。所采取的干预措施遵循结构化方法,包括立即进行岩石支护、在破坏区进行岩土工程和地质调查以及设计修改。还对失效区进行了反分析,以根据观测到的地质条件评估设计参数。使用修改后的设计参数对破坏区进行了重新评估,其中包括较短的台阶、较长的岩石锚杆等岩石支护安装方案、喷射混凝土加固肋和减少的施工进度。在破坏区及其周围进行岩土工程监测,以记录岩体中的任何警报运动。最初,每天在洞穴最近开挖的区域进行岩土监测。根据至少一周的连续监测数据,可以决定后续监测的频率。在大多数情况下,岩体的变形远小于根据不同岩石类别的详细设计计算的警报值。本文论述了完成洞室施工的失败、调查、原因、评价及补救措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Archives of Mining Sciences
Archives of Mining Sciences 工程技术-矿业与矿物加工
CiteScore
2.40
自引率
16.70%
发文量
0
审稿时长
20 months
期刊介绍: Archives of Mining Sciences (AMS) is concerned with original research, new developments and case studies in mining sciences and energy, civil engineering and environmental engineering. The journal provides an international forum for the publication of high quality research results in: mining technologies, mineral processing, stability of mine workings, mining machine science, ventilation systems, rock mechanics, termodynamics, underground storage of oil and gas, mining and engineering geology, geotechnical engineering, tunnelling, design and construction of tunnels, design and construction on mining areas, mining geodesy, environmental protection in mining, revitalisation of postindustrial areas. Papers are welcomed on all relevant topics and especially on theoretical developments, analytical methods, numerical methods, rock testing, site investigation, and case studies.
期刊最新文献
Experimental Study of Lignite Structure Evolution Characteristics and Mechanisms under Thermal-Mechanical Co-function Landslide Survey at Cam Mountain (An Giang, Vietnam) by Seismic Refraction and GPR Methods Comparative Testing of Cable Bolt and Wire Rope Lacing Resistance to Static and Dynamic Loads Experimental Study on the Slime Flotation Process of Low-Rank Steam Coal by the Small Cone Angle Hydrocyclone Group Field Testing of the Methods for Prevention and Control of Coal and Gas Outburst – A Case Study in Poland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1