Evaluation of the Idle time of Single-Chain and Double-Chain Overhead Power Lines of 6–10 kV by Methods of Queuing Theory

IF 0.3 Q4 ENERGY & FUELS Problemele Energeticii Regionale Pub Date : 2022-11-01 DOI:10.52254/1857-0070.2022.4-56.01
V. Basmanov, V. Kholmanskikh
{"title":"Evaluation of the Idle time of Single-Chain and Double-Chain Overhead Power Lines of 6–10 kV by Methods of Queuing Theory","authors":"V. Basmanov, V. Kholmanskikh","doi":"10.52254/1857-0070.2022.4-56.01","DOIUrl":null,"url":null,"abstract":"The aim of this work is to substantiate the idle time evaluation of the overhead power line (OPL) according to the reliability indicators of its main elements using the probability value of the overhead power line availability factor. Statistical studies of the 17 OPL were performed to achieve this goal. The results of the statistical data processing made it possible to consider over-head lines as objects of a multiple action, and their failure and recovery flows as the primitive Poissonian flows. The calculation of the Wilcoxon and Pearson criteria confirmed the uniformi-ty of the statistical material both in terms of failure times and recovery time for all 17 studied OPL, which allowed combining the uniform statistical data into two representative samples, ac-cording to failures and recoveries, for the generalized district OPL and calculate its reliability indicators. The most significant result is the justification of applying queuing theory methods to evaluate the idle time of 6–10 kV single-chain and double-chain of overhead lines. The signifi-cance of the results obtained consists in that a simple engineering method is proposed to evalu-ate the availability factor of the overhead power line according to the reliability indicators of its main elements, which allows predicting the idle time of the overhead line for the upcoming cal-endar year of its operation. The newly obtained availability factors of the main overhead line elements can be used in the overhead power lines’ design.","PeriodicalId":41974,"journal":{"name":"Problemele Energeticii Regionale","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2022-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Problemele Energeticii Regionale","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52254/1857-0070.2022.4-56.01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

The aim of this work is to substantiate the idle time evaluation of the overhead power line (OPL) according to the reliability indicators of its main elements using the probability value of the overhead power line availability factor. Statistical studies of the 17 OPL were performed to achieve this goal. The results of the statistical data processing made it possible to consider over-head lines as objects of a multiple action, and their failure and recovery flows as the primitive Poissonian flows. The calculation of the Wilcoxon and Pearson criteria confirmed the uniformi-ty of the statistical material both in terms of failure times and recovery time for all 17 studied OPL, which allowed combining the uniform statistical data into two representative samples, ac-cording to failures and recoveries, for the generalized district OPL and calculate its reliability indicators. The most significant result is the justification of applying queuing theory methods to evaluate the idle time of 6–10 kV single-chain and double-chain of overhead lines. The signifi-cance of the results obtained consists in that a simple engineering method is proposed to evalu-ate the availability factor of the overhead power line according to the reliability indicators of its main elements, which allows predicting the idle time of the overhead line for the upcoming cal-endar year of its operation. The newly obtained availability factors of the main overhead line elements can be used in the overhead power lines’ design.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用排队论方法评价6 - 10kv单链和双链架空电力线路的空闲时间
本文的目的是利用架空电力线可用性因子的概率值,根据架空电力线主要元件的可靠性指标,对架空电力线的空闲时间进行评估。为了实现这一目标,对17个OPL进行了统计研究。统计数据处理的结果使得可以将顶线视为多重作用的对象,并将其失效和恢复流视为原始泊松流。Wilcoxon和Pearson标准的计算证实了所有17个所研究的OPL在故障时间和恢复时间方面的统计材料的一致性,从而可以将统一的统计数据合并为两个代表性样本,根据故障和恢复,用于广义区域OPL并计算其可靠性指标。最重要的结果是证明了应用排队论方法评价6-10 kV架空线单链和双链空闲时间的合理性。所得结果的意义在于,提出了一种简单的工程方法,根据架空电力线路主要元件的可靠性指标来评估架空电力线路的可用性系数,从而对即将到来的架空电力线路运行日历年的空闲时间进行预测。新得到的主要架空线路元件的可用性系数可用于架空电力线路的设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
0.70
自引率
33.30%
发文量
38
期刊最新文献
Reduction of Voltage Fluctuations in Electrical Networks Supplying Motors with a Rapidly Changing Load by Installing Longitudinal Compensation Batteries Intelligent System of Relay Protection of Electrical Network 6-10 kV with the Implementation of Automatic Correction of the Operation Set Point Energy-Efficient Modes of Dehydration of Pome Fruits during Microwave Treatment in Combination with Convection Congestion Management Using an Optimized Deep Convolution Neural Network in Deregulated Environment Study of the Efficiency of Heat-Supply Systems with Steam Turbine CHP Plants, Taking into Account Changes in the Temperature of the Delivery Water during Transportation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1