Seismic building design work process using building information modeling (BIM) technology for Malaysian Government projects

Siti Zati Hanani Mahamood, M. Fathi
{"title":"Seismic building design work process using building information modeling (BIM) technology for Malaysian Government projects","authors":"Siti Zati Hanani Mahamood, M. Fathi","doi":"10.1108/ijdrbe-10-2021-0135","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis paper aims to improve the seismic building design (SBD) work process for Malaysian Government projects.\n\n\nDesign/methodology/approach\nSemi-structured interviews were virtually conducted to a small sample size of internal and external stakeholders from the Malaysian Government technical agency. There were seven of them, comprising Structural Engineers, an Architect, a Quantity Surveyor and consultants-linked government projects. The respondents have at least five years of experience in building design and construction.\n\n\nFindings\nThe paper evaluates the current SBD work process in the government technical agency. There were four main elements that appear to need to be improved, specifically in the design stage: limitations in visualization, variation of works, data management and coordination.\n\n\nResearch limitations/implications\nThis study was limited to Malaysian Government building projects and covered a small sample size. Therefore, further research is recommended to extend to other government agencies or ministries to obtain better results. Furthermore, the findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects.\n\n\nPractical implications\nThe findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects.\n\n\nSocial implications\nThis study was limited to government building projects and covered a small sample size. Therefore, further research is recommended to extend to other government agencies or ministries to obtain better results. Furthermore, the findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects.\n\n\nOriginality/value\nThis study provides an initial step to introduce the potential of building information modeling for SBD in implementing Malaysian Government projects. It will be beneficial both pre-and post-disaster and is a significant step toward a resilient infrastructure and community.\n","PeriodicalId":45983,"journal":{"name":"International Journal of Disaster Resilience in the Built Environment","volume":" ","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2022-02-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Disaster Resilience in the Built Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijdrbe-10-2021-0135","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose This paper aims to improve the seismic building design (SBD) work process for Malaysian Government projects. Design/methodology/approach Semi-structured interviews were virtually conducted to a small sample size of internal and external stakeholders from the Malaysian Government technical agency. There were seven of them, comprising Structural Engineers, an Architect, a Quantity Surveyor and consultants-linked government projects. The respondents have at least five years of experience in building design and construction. Findings The paper evaluates the current SBD work process in the government technical agency. There were four main elements that appear to need to be improved, specifically in the design stage: limitations in visualization, variation of works, data management and coordination. Research limitations/implications This study was limited to Malaysian Government building projects and covered a small sample size. Therefore, further research is recommended to extend to other government agencies or ministries to obtain better results. Furthermore, the findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects. Practical implications The findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects. Social implications This study was limited to government building projects and covered a small sample size. Therefore, further research is recommended to extend to other government agencies or ministries to obtain better results. Furthermore, the findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects. Originality/value This study provides an initial step to introduce the potential of building information modeling for SBD in implementing Malaysian Government projects. It will be beneficial both pre-and post-disaster and is a significant step toward a resilient infrastructure and community.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用建筑信息模型(BIM)技术的马来西亚政府项目抗震建筑设计工作流程
目的本文旨在改进马来西亚政府项目的抗震建筑设计(SBD)工作流程。设计/方法/方法对来自马来西亚政府技术机构的内部和外部利益相关者的小样本进行了半结构化访谈。其中七名成员包括结构工程师、一名建筑师、一名工料测量师及与政府工程项目有关的顾问。受访者至少有五年的建筑设计和建造经验。本文评估了目前政府技术机构的SBD工作流程。有四个主要因素似乎需要改进,特别是在设计阶段:可视化的局限性、作品的变化、数据管理和协调。研究局限/启示本研究仅限于马来西亚政府建筑项目,样本量较小。因此,建议进一步的研究扩展到其他政府机构或部委,以获得更好的结果。此外,改进SBD工作过程的发现和建议也可以复制到其他类似的灾害恢复项目中。实际意义改进SBD工作过程的发现和建议也可以复制到其他类似的灾害恢复项目中。社会影响本研究仅限于政府建筑项目,样本量较小。因此,建议进一步的研究扩展到其他政府机构或部委,以获得更好的结果。此外,改进SBD工作过程的发现和建议也可以复制到其他类似的灾害恢复项目中。原创性/价值本研究提供了一个初步的步骤,以介绍建筑信息模型在实施马来西亚政府项目中的潜力。这对灾前和灾后都是有益的,是朝着有弹性的基础设施和社区迈出的重要一步。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.40
自引率
6.20%
发文量
49
期刊最新文献
Scale to measure project resilience for the construction sector to cope with hazards Climate change adaptation through nature-based solution: examining the case of Thakurani Khal of Mongla Port Municipality, Bagerhat Bangladesh Climate change adaptation and mitigation at individual level: knowledge and attitudes among school teachers in Kalutara district Preparedness for a low-carbon future – knowledge level of built environment students Analyzing physical environment of Child Friendly Spaces in emergencies: in the context of Rohingya crisis at Cox’s Bazar, Bangladesh
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1