Human capacity building strategies for improving PPP implementation in Tanzanian construction projects

IF 1.9 Q3 ENGINEERING, CIVIL Built Environment Project and Asset Management Pub Date : 2022-05-19 DOI:10.1108/bepam-08-2021-0110
N. Chileshe, N. Kavishe
{"title":"Human capacity building strategies for improving PPP implementation in Tanzanian construction projects","authors":"N. Chileshe, N. Kavishe","doi":"10.1108/bepam-08-2021-0110","DOIUrl":null,"url":null,"abstract":"PurposeImplementation of public–private partnerships (PPPs) in African projects is inundated with a number of capacity building challenges which affects growth and project performance. Further, there is paucity of empirical studies on the strategies for overcoming these challenges. Therefore, this research addresses that knowledge gap by examining the human capacity building (HCB) strategies for improving PPP implementation in construction projects in developing countries, with a focus on Tanzania.Design/methodology/approachHCB strategies identified from the scoping review were administered to 81 handpicked Tanzanian practitioners attending PPP training course. To examine the differences in the perception of the identified HCB strategies, and the relationships between different pairs of the HCB strategies, the data were subjected descriptive statistics, parametric tests, Kendall’s concordance and Pearson correlational analysis, including group wise correlation analysis.FindingsBased on the overall sample, “Engagement of stakeholders on capacity development”, “Organization of PPP seminars and training” and “Introduction of in-house training to Public institutions expected to undertake PPP projects” are the top ranked HCB strategies. “Development of study tours to stakeholders involved in PPP projects” is the least ranked. Significant differences between the sub-groups of “no PPP experience” and “some PPP experience” were evident for “Invitation of International experts to share experiences” and “Sharing of responsibilities” HCB strategies. The “no PPP experience” group rated both strategies higher than those with “some PPP experience”.Practical implicationsThe identified HCB strategies can be used as a “road map” for the development of appropriate engagement strategies with various stakeholders for the successful implementation of PPP thereby, enhancing the performance of the construction firms.Originality/valueEight strategies have been identified from the literature and tested for the Tanzanian context. The uniqueness of Tanzanian PPP implementation context arising from varying cultural, organizational, political and economic conditions differentiates the priority of HCB strategies when compared to other contexts where these strategies were investigated. This is germane to the PPP research.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2022-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-08-2021-0110","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 2

Abstract

PurposeImplementation of public–private partnerships (PPPs) in African projects is inundated with a number of capacity building challenges which affects growth and project performance. Further, there is paucity of empirical studies on the strategies for overcoming these challenges. Therefore, this research addresses that knowledge gap by examining the human capacity building (HCB) strategies for improving PPP implementation in construction projects in developing countries, with a focus on Tanzania.Design/methodology/approachHCB strategies identified from the scoping review were administered to 81 handpicked Tanzanian practitioners attending PPP training course. To examine the differences in the perception of the identified HCB strategies, and the relationships between different pairs of the HCB strategies, the data were subjected descriptive statistics, parametric tests, Kendall’s concordance and Pearson correlational analysis, including group wise correlation analysis.FindingsBased on the overall sample, “Engagement of stakeholders on capacity development”, “Organization of PPP seminars and training” and “Introduction of in-house training to Public institutions expected to undertake PPP projects” are the top ranked HCB strategies. “Development of study tours to stakeholders involved in PPP projects” is the least ranked. Significant differences between the sub-groups of “no PPP experience” and “some PPP experience” were evident for “Invitation of International experts to share experiences” and “Sharing of responsibilities” HCB strategies. The “no PPP experience” group rated both strategies higher than those with “some PPP experience”.Practical implicationsThe identified HCB strategies can be used as a “road map” for the development of appropriate engagement strategies with various stakeholders for the successful implementation of PPP thereby, enhancing the performance of the construction firms.Originality/valueEight strategies have been identified from the literature and tested for the Tanzanian context. The uniqueness of Tanzanian PPP implementation context arising from varying cultural, organizational, political and economic conditions differentiates the priority of HCB strategies when compared to other contexts where these strategies were investigated. This is germane to the PPP research.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
改善坦桑尼亚建筑项目PPP实施的人力能力建设战略
目的在非洲项目中实施公私伙伴关系面临着大量的能力建设挑战,这些挑战影响了增长和项目绩效。此外,关于克服这些挑战的战略的实证研究很少。因此,本研究通过研究人力能力建设(HCB)战略来解决这一知识差距,以改善发展中国家建筑项目中PPP的实施,重点是坦桑尼亚。范围审查中确定的设计/方法/方法HCB战略对81名参加PPP培训课程的坦桑尼亚从业者进行了管理。为了检验对已识别的HCB策略的感知差异,以及不同对HCB策略之间的关系,对数据进行了描述性统计、参数检验、Kendall一致性和Pearson相关分析,包括逐组相关分析。调查结果基于总体样本,“利益相关者参与能力发展”、“组织PPP研讨会和培训”以及“向预计承担PPP项目的公共机构引入内部培训”是排名最高的HCB战略。“为参与PPP项目的利益相关者开发考察团”排名最低。在“邀请国际专家分享经验”和“分担责任”HCB战略中,“没有PPP经验”与“有PPP经验”这两个子组之间存在显著差异。“没有PPP经验”组对这两种策略的评分都高于“有PPP经验”的策略。实际意义。已确定的HCB策略可作为与各利益相关者制定适当参与策略的“路线图”,以成功实施PPP,从而提高建筑公司的绩效。独创性/价值从文献中确定了八种策略,并在坦桑尼亚背景下进行了测试。坦桑尼亚PPP实施环境的独特性源于不同的文化、组织、政治和经济条件,与调查这些战略的其他环境相比,HCB战略的优先级有所不同。这与PPP研究密切相关。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
期刊最新文献
Application of lean principles for building refurbishment projects in Sri Lanka Unraveling consumer behavioral intentions to adopt solar water heaters in India using UTAUT model Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects Benefits and challenges of implementing green building development in Nigeria Developing a framework for building information modelling (BIM) adoption in New Zealand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1