Availability and Feasibility of Demand Side Management Projects in Egypt

M. Gaber, A. Atef, Amr El Zawawi, M. Salah
{"title":"Availability and Feasibility of Demand Side Management Projects in Egypt","authors":"M. Gaber, A. Atef, Amr El Zawawi, M. Salah","doi":"10.21625/ARCHIVE.V2I4.386","DOIUrl":null,"url":null,"abstract":"Demand Side Management (DSM) results in energy consumption reduction accompanied by lower cost according to the feasibility study for each project. In Egypt, DSM projects are scarce due to lack of good studies proving their underlining profitability. This paper studies the major types of DSM programs and their availability to be executed in Egypt. Tips to measure feasibility for these projects are given using the Net Present Value (NPV), Internal Rate of Return (IRR), Profitability Index (PI), Payback Period (PP) and Discounted Payback \nPeriod(DPP). Different factors affecting the projects to study like the inflation factor and the discount rate are studied. This paper also investigates a new sustainable way for natural illumination called the sun tunnel. This method is presented with its different types: rigid and flexible as a case study.","PeriodicalId":33666,"journal":{"name":"ARCHiveSR","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ARCHiveSR","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21625/ARCHIVE.V2I4.386","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Demand Side Management (DSM) results in energy consumption reduction accompanied by lower cost according to the feasibility study for each project. In Egypt, DSM projects are scarce due to lack of good studies proving their underlining profitability. This paper studies the major types of DSM programs and their availability to be executed in Egypt. Tips to measure feasibility for these projects are given using the Net Present Value (NPV), Internal Rate of Return (IRR), Profitability Index (PI), Payback Period (PP) and Discounted Payback Period(DPP). Different factors affecting the projects to study like the inflation factor and the discount rate are studied. This paper also investigates a new sustainable way for natural illumination called the sun tunnel. This method is presented with its different types: rigid and flexible as a case study.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
埃及需求侧管理项目的可用性和可行性
根据每个项目的可行性研究,需求侧管理(DSM)可以降低能源消耗,同时降低成本。在埃及,由于缺乏证明其突出盈利能力的良好研究,DSM项目很少。本文研究了埃及DSM项目的主要类型及其可执行性。使用净现值(NPV)、内部收益率(IRR)、盈利能力指数(PI)、回报期(PP)和贴现回报期(DPP)来衡量这些项目的可行性。研究了通货膨胀因素和贴现率等影响研究项目的不同因素。本文还研究了一种新的可持续的自然照明方式,称为太阳隧道。以刚性和柔性两种不同类型的方法为例进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
8
审稿时长
12 weeks
期刊最新文献
Endangered Religious Cultural Heritage Public Space as Urban Cultural and Tourism Education Facility with Historical Atmosphere Palestine Hotel in the Old City of Hebron, Between Modernity and Traditional Dwelling Architecture During the 19th-20th Century Taj Mahal is the Crystallization of Iranian Architecture and a Symbol of God's Throne on Earth Contradictions of Saint Paul’s Cathedral
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1