Operations and maintenance optimisation for a 100 MW wave energy farm in Ireland

S. Giorgi, A. Henry, Ben Kennedy, Joseph Van't Hoff, R. Costello, Pierre Lourdais, Hervé Gaviglio, Matt Dickson
{"title":"Operations and maintenance optimisation for a 100 MW wave energy farm in Ireland","authors":"S. Giorgi, A. Henry, Ben Kennedy, Joseph Van't Hoff, R. Costello, Pierre Lourdais, Hervé Gaviglio, Matt Dickson","doi":"10.36688/imej.5.349-362","DOIUrl":null,"url":null,"abstract":"Marine operations that are required for the development and service of offshore wave energy farms represent a significant proportion of the total project costs. These operations can be optimised through design and innovation to improve the LCOE of the project. This paper presents an analysis of marine operations in offshore renewable energy projects and ows the importance of early, detailed analysis and optimisation of these activities. The analysis uses general-purpose techno-economic analysis software developed by Wave Venture. The software provides an integrated engineering and financial simulation specifically designed for the needs of offshore renewable energy technology. A 100 MW wave energy farm, made up of 250 CorPower devices, off the west coast of Ireland is defined and analysed to demonstrate the capabilities of the techno-economic analysis incorporating a marine operations logistics model. The results demonstrate the strength of integrated logistics and finance software in the analysis and design of wave farms, and how these simulations can lead to significant improvements in the LCOE of offshore renewable energy projects.","PeriodicalId":36111,"journal":{"name":"International Marine Energy Journal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Marine Energy Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36688/imej.5.349-362","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

Marine operations that are required for the development and service of offshore wave energy farms represent a significant proportion of the total project costs. These operations can be optimised through design and innovation to improve the LCOE of the project. This paper presents an analysis of marine operations in offshore renewable energy projects and ows the importance of early, detailed analysis and optimisation of these activities. The analysis uses general-purpose techno-economic analysis software developed by Wave Venture. The software provides an integrated engineering and financial simulation specifically designed for the needs of offshore renewable energy technology. A 100 MW wave energy farm, made up of 250 CorPower devices, off the west coast of Ireland is defined and analysed to demonstrate the capabilities of the techno-economic analysis incorporating a marine operations logistics model. The results demonstrate the strength of integrated logistics and finance software in the analysis and design of wave farms, and how these simulations can lead to significant improvements in the LCOE of offshore renewable energy projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
爱尔兰100兆瓦波浪能农场的运行和维护优化
海上波浪能发电场的开发和服务所需的海上作业占项目总成本的很大一部分。这些操作可以通过设计和创新进行优化,以提高项目的LCOE。本文对海上可再生能源项目中的海洋作业进行了分析,并强调了对这些活动进行早期、详细分析和优化的重要性。该分析使用Wave Venture开发的通用技术经济分析软件。该软件提供了专门为海上可再生能源技术需求设计的集成工程和财务模拟。定义并分析了位于爱尔兰西海岸的一个由250个CorPower设备组成的100MW波浪能发电场,以证明结合海洋作业物流模型的技术经济分析的能力。研究结果证明了综合物流和金融软件在波浪场分析和设计中的优势,以及这些模拟如何显著改善海上可再生能源项目的LCOE。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
International Marine Energy Journal
International Marine Energy Journal Engineering-Ocean Engineering
CiteScore
1.70
自引率
0.00%
发文量
24
审稿时长
12 weeks
期刊最新文献
Linear hydrodynamic model of rotating lift-based wave energy converters Effects of small marine energy deployments on oceanographic systems Engaging the Regulatory Community to Aid Environmental Consenting/Permitting Processes for Marine Renewable Energy Environmental and Social Acceptance module: reducing global and local environmental impacts for Ocean Energy Projects Assessment of potential wave power along a coastal province, Central Vietnam
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1