Further operation of flexible biogas plants – realisable bid prices in the EEG 2017

Q4 Agricultural and Biological Sciences Landtechnik Pub Date : 2020-05-29 DOI:10.15150/LT.2020.3235
Kevin Haensel, Tino Barchmann, M. Dotzauer, E. Fischer, J. Liebetrau
{"title":"Further operation of flexible biogas plants – realisable bid prices in the EEG 2017","authors":"Kevin Haensel, Tino Barchmann, M. Dotzauer, E. Fischer, J. Liebetrau","doi":"10.15150/LT.2020.3235","DOIUrl":null,"url":null,"abstract":"With the tendering procedure of the Renewable Energy Sources Act (Erneuerbare-Energien-Gesetz, EEG) 2017, the opportunity was created to transfer existing biogas plants into a 10-year follow-up remuneration through new commissioning. A detailed analysis of possible revenues and costs can be an advantage when placing bids. Thus provide clarity about the economic situation of a biogas plant during the follow-up period. The aim of this paper is to demonstrate that there are potential economic options for selected existing biogas plants in Germany in the electricity market. Namely to switch to the tender design under EEG 2017 and to take advantage of the 10-year follow-up remuneration. For now, the tender corridors beyond 2022 are not determined yet. But in the course of an upcoming amendment of the Renewable Energy Sources Act it is likely that there will be a notable corridor volume from 2023 onwards. In addition to the ability to operate flexibly, the decisive factor for the economic operation of a plant beyond the 20-year EEG remuneration period is the levelized costs of electricity (LCOE). Or more precisely the LCOE that can be realized in the follow-up period. If a subsidy charge can be achieved that, combined with market earnings, exceeds the average LCOE in the follow-up period, economic operation is ensured. Otherwise, additional sources of revenue or cost reduction potential must be tapped.","PeriodicalId":35524,"journal":{"name":"Landtechnik","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Landtechnik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15150/LT.2020.3235","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Agricultural and Biological Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

With the tendering procedure of the Renewable Energy Sources Act (Erneuerbare-Energien-Gesetz, EEG) 2017, the opportunity was created to transfer existing biogas plants into a 10-year follow-up remuneration through new commissioning. A detailed analysis of possible revenues and costs can be an advantage when placing bids. Thus provide clarity about the economic situation of a biogas plant during the follow-up period. The aim of this paper is to demonstrate that there are potential economic options for selected existing biogas plants in Germany in the electricity market. Namely to switch to the tender design under EEG 2017 and to take advantage of the 10-year follow-up remuneration. For now, the tender corridors beyond 2022 are not determined yet. But in the course of an upcoming amendment of the Renewable Energy Sources Act it is likely that there will be a notable corridor volume from 2023 onwards. In addition to the ability to operate flexibly, the decisive factor for the economic operation of a plant beyond the 20-year EEG remuneration period is the levelized costs of electricity (LCOE). Or more precisely the LCOE that can be realized in the follow-up period. If a subsidy charge can be achieved that, combined with market earnings, exceeds the average LCOE in the follow-up period, economic operation is ensured. Otherwise, additional sources of revenue or cost reduction potential must be tapped.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
柔性沼气厂的进一步运营——2017年EEG的可实现投标价格
根据2017年《可再生能源法》(erneuerbore - energien - gesetz, EEG)的招标程序,有机会通过新的调试将现有的沼气厂转移到10年的后续报酬中。在投标时,对可能的收入和成本的详细分析可能是一个优势。从而在后续期间提供关于沼气厂经济状况的清晰信息。本文的目的是证明,在电力市场上,德国现有的沼气厂有潜在的经济选择。即转换为EEG 2017下的投标设计,并利用10年的后续报酬。目前,2022年以后的招标走廊尚未确定。但在即将修订的《可再生能源法》中,从2023年起,可能会有一个显著的走廊量。除了灵活运行的能力外,电厂在20年EEG报酬期之后的经济运行的决定性因素是电力成本(LCOE)的平准化。或者更准确地说,在后续阶段可以实现的LCOE。如果能够实现补贴收费,并结合市场收益,在后续阶段超过平均LCOE,则可以保证经济运行。否则,就必须挖掘额外的收入来源或降低成本的潜力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Landtechnik
Landtechnik Agricultural and Biological Sciences-Agronomy and Crop Science
CiteScore
1.10
自引率
0.00%
发文量
0
审稿时长
16 weeks
期刊最新文献
Untersuchung zur Desintegration von Gärmedien in einer parallel betriebenen Pilotbiogasanlage Umsetzung einer prädiktiven Fahrstrategie durch radarbasierte Steigungserkennung in Traktoren Development and evaluation of a device to incorporate biodegradable textiles into sports turfs Gärrestaufbereitung als Beitrag zur Nährstoffentfrachtung von Überschussregionen – Kosten und Treibhausgasemissionen Food-scanner applications in the fruit and vegetable sector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1