{"title":"Implementation of Contractor Safety Management System as a Requirement for Partners at a Petrochemical Company","authors":"Yuliana Duwi Kusuma Wardhani","doi":"10.20473/ijosh.v11i1.2022.1-11","DOIUrl":null,"url":null,"abstract":"Introduction: Data Report Safety Performance Indicator for Oil and Gas Producers (OGP) in 2018 recorded 2 deaths at the company and 29 deaths occurred to the contractors, with Fatal Accident Rate (FAR) in the company of 0.31 accidents per 1 million working hours and in contractors of 1.20 accidents per 1 million work hours. PT Pupuk Kujang as a petrochemical company has a high-risk of implementation of Contractor Safety Management Systemn (CSMS) to protect safety of contractors. This research aims to evaluate the implementation of Contractor Safety Management System (CSMS). Methods: This study was a descriptive study with an observational method for data collection, and this study was cross-sectional. The variable studied was Contractor Safety Management System (CSMS) including CSMS stages and documents. Results: PT Pupuk Kujang has implemented six stages for the implementation of Contractor Safety Management System (CSMS), namely identification and risk assessment, prequalification, selection, initial work activities, assessment during work, and final assessment of work. However, some shortcomings were observed in the implementation of pre-qualification stage where before being declared to have passed the pre-qualification assessment stage, a local contractor has been appointed as the winner of the tender. Conclusion: The implementation of Contractor Safety Management System (CSMS) at PT Pupuk Kujang still does not run well because there are deficiencies in the prequalification stage.Keywords: contractor safety management system, pt pupuk kujang, prequalification","PeriodicalId":33133,"journal":{"name":"The Indonesian Journal of Occupational Safety and Health","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Indonesian Journal of Occupational Safety and Health","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20473/ijosh.v11i1.2022.1-11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Introduction: Data Report Safety Performance Indicator for Oil and Gas Producers (OGP) in 2018 recorded 2 deaths at the company and 29 deaths occurred to the contractors, with Fatal Accident Rate (FAR) in the company of 0.31 accidents per 1 million working hours and in contractors of 1.20 accidents per 1 million work hours. PT Pupuk Kujang as a petrochemical company has a high-risk of implementation of Contractor Safety Management Systemn (CSMS) to protect safety of contractors. This research aims to evaluate the implementation of Contractor Safety Management System (CSMS). Methods: This study was a descriptive study with an observational method for data collection, and this study was cross-sectional. The variable studied was Contractor Safety Management System (CSMS) including CSMS stages and documents. Results: PT Pupuk Kujang has implemented six stages for the implementation of Contractor Safety Management System (CSMS), namely identification and risk assessment, prequalification, selection, initial work activities, assessment during work, and final assessment of work. However, some shortcomings were observed in the implementation of pre-qualification stage where before being declared to have passed the pre-qualification assessment stage, a local contractor has been appointed as the winner of the tender. Conclusion: The implementation of Contractor Safety Management System (CSMS) at PT Pupuk Kujang still does not run well because there are deficiencies in the prequalification stage.Keywords: contractor safety management system, pt pupuk kujang, prequalification
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
实施承包商安全管理制度是石化公司合作伙伴的要求
简介:数据报告《2018年石油和天然气生产商安全绩效指标》记录了该公司2人死亡,承包商29人死亡,其中该公司的致命事故率(FAR)为每100万工作小时0.31起,承包商为每100万工作小时1.20起。PT Pupuk Kujang作为一家石化公司,实施承包商安全管理系统(CSMS)以保护承包商的安全具有高风险。本研究旨在评估承包商安全管理系统(CSMS)的实施情况。方法:本研究为描述性研究,采用观察性方法收集数据,本研究为横断面研究。所研究的变量是承包商安全管理系统(CSMS),包括CSMS阶段和文件。结果:PT Pupuk Kujang实施了承包商安全管理体系(CSMS)的六个阶段,即识别和风险评估、资格预审、选择、初始工作活动、工作中的评估和工作的最终评估。然而,在资格预审阶段的实施过程中发现了一些不足之处,即在宣布通过资格预审评估阶段之前,一名当地承包商已被任命为中标人。结论:由于资格预审阶段存在不足,PT Pupuk Kujang的承包商安全管理系统(CSMS)的实施仍不顺利。关键词:承包商安全管理体系,pt pupuk kujang,资格预审
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
0.40
自引率
0.00%
发文量
40
审稿时长
5 weeks
期刊最新文献
Proposed Workstation Design in Laboratory for Musculoskeletal Disorder Complaints The Paradox of Health and Safety Risks: A Disclose of Handling Strategies in Informal Construction Sites in Tanzania Implementation of Occupational Safety and Health Management System in the Education Sector The Effect of Work, Family Conflict, and Work Shifts on the Performance of Midwives with Work Stress as Intervening Variables Work Safety Aspects on the Sea on Small-Scale Fishermen in Jember Regency, Indonesia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1