Safety assessment for a ballast railway induced by underground subway tunnel blasting: A case study

IF 2.1 Q2 ENGINEERING, CIVIL International Journal of Protective Structures Pub Date : 2023-01-09 DOI:10.1177/20414196221150661
Bowen Zhao, N. Jiang, Chuan-bo Zhou, Yingkang Yao, Wenbin Zhou, Zhongwei Cai
{"title":"Safety assessment for a ballast railway induced by underground subway tunnel blasting: A case study","authors":"Bowen Zhao, N. Jiang, Chuan-bo Zhou, Yingkang Yao, Wenbin Zhou, Zhongwei Cai","doi":"10.1177/20414196221150661","DOIUrl":null,"url":null,"abstract":"Modern railroad infrastructure is subject to blast vibrations. The dynamic safety of an operating railroad under the influence of tunnel blasting is a primary problem for metro development in urban areas. In this paper, the blasting excavation of Wuhan Metro Line 5 was selected as a case. The ballast rail- sleeper- ballast bed composite structure numerical model was developed and validated in order to evaluate the ballast railway’s safety. The smoothed particle hydrodynamics element was chosen to replicate the ballast bed due to the instability and unpredictability of the ballast bed constructed from crushed stone. Further analysis was conducted on the dynamic response characteristics of the ballast rail-sleeper-ballast bed composite structure. On the basis of the parameter calculation and analysis, a prediction model of the blast vibration velocity of the ballast rail under blasting conditions was developed. Next, the rail was simulated as a semi-infinite Euler beam and placed on the Kelvin foundation to calculate the rail displacement at the train’s limited operation speed. By substituting the maximum rail displacement when the train is running at maximum speed into the rail velocity prediction model, it is possible to determine the maximum blast velocity that the rail can withstand in this instance. In this case, the ballast bed, sleeper, and ballast rail were also deemed safe.","PeriodicalId":46272,"journal":{"name":"International Journal of Protective Structures","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2023-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Protective Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/20414196221150661","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Modern railroad infrastructure is subject to blast vibrations. The dynamic safety of an operating railroad under the influence of tunnel blasting is a primary problem for metro development in urban areas. In this paper, the blasting excavation of Wuhan Metro Line 5 was selected as a case. The ballast rail- sleeper- ballast bed composite structure numerical model was developed and validated in order to evaluate the ballast railway’s safety. The smoothed particle hydrodynamics element was chosen to replicate the ballast bed due to the instability and unpredictability of the ballast bed constructed from crushed stone. Further analysis was conducted on the dynamic response characteristics of the ballast rail-sleeper-ballast bed composite structure. On the basis of the parameter calculation and analysis, a prediction model of the blast vibration velocity of the ballast rail under blasting conditions was developed. Next, the rail was simulated as a semi-infinite Euler beam and placed on the Kelvin foundation to calculate the rail displacement at the train’s limited operation speed. By substituting the maximum rail displacement when the train is running at maximum speed into the rail velocity prediction model, it is possible to determine the maximum blast velocity that the rail can withstand in this instance. In this case, the ballast bed, sleeper, and ballast rail were also deemed safe.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
地下地铁隧道爆破诱发有碴轨道的安全性评价:一个实例
现代铁路基础设施容易受到冲击振动的影响。隧道爆破影响下运营铁路的动态安全是城市地铁发展的首要问题。本文以武汉地铁5号线的爆破开挖为例进行了研究。为了评价有砟铁路的安全性,建立了有砟轨道-轨枕-道床复合结构的数值模型并进行了验证。由于碎石道床的不稳定性和不可预测性,选择了光滑颗粒流体力学元件来复制道床。对有砟轨道-轨枕-道床复合结构的动力响应特性进行了进一步的分析。在参数计算和分析的基础上,建立了爆破条件下有碴轨道爆破振动速度的预测模型。接下来,将轨道模拟为半无限长的欧拉梁,并将其放置在开尔文基础上,以计算列车有限运行速度下的轨道位移。通过将列车以最大速度运行时的最大轨道位移代入轨道速度预测模型,可以确定在这种情况下轨道能够承受的最大爆炸速度。在这种情况下,道床、轨枕和有砟轨道也被认为是安全的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.30
自引率
25.00%
发文量
48
期刊最新文献
Investigating the significance of non-ideal effects in large-scale blast propagation A high explosive blast simulator Pounding response of concrete rods with rough impacting surfaces Airblast observations and near-field modeling of the large surface explosion coupling experiment Development of a fast-running method for prediction of blast propagation in partially confined spaces
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1