The challenges of access to local finance for PPP infrastructure project delivery in Nigeria

Muhammed Bolomope, K. B. Awuah, Abdul-Rasheed Amidu, O. Filippova
{"title":"The challenges of access to local finance for PPP infrastructure project delivery in Nigeria","authors":"Muhammed Bolomope, K. B. Awuah, Abdul-Rasheed Amidu, O. Filippova","doi":"10.1108/JFMPC-10-2019-0078","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis study explores the challenges of access to finance from local financial institutions (LFIs), i.e. local banks, for public–private partnership (PPP) infrastructure project delivery in Nigeria. The aim is to provide useful insights that could inform policy solutions to ease the local funding of PPP infrastructure projects in Nigeria and, by extension, other developing economies.\n\n\nDesign/methodology/approach\nAdopting a qualitative research methodology, the study engaged PPP stakeholders involved in securing funds for PPP infrastructure projects in Nigeria. A total of 15 PPP stakeholders, drawn from the public and private sectors, were purposively selected and their views on the research problem obtained through recorded telephone interviews. The opinions of the research participants were subsequently analyzed and the results discussed with the outcome of the examination of relevant literature.\n\n\nFindings\nThe study found that the significant factors affecting access to local finance for PPP infrastructure projects in Nigeria include low capital base by LFIs, weak project viability, lack of capacity to manage PPP-related activities, inconsistent government policy, poor legal framework and public perception of PPP.\n\n\nResearch limitations/implications\nInsights from this study are useful for PPP stakeholders in mitigating the barriers that influence access to local finance for PPP infrastructure projects in Nigeria and other developing economies. This study is also useful in enhancing the current policy structure in developing countries as a way of revamping the existing infrastructure framework through LFIs.\n\n\nOriginality/value\nThis study provides clarity on the peculiar challenges impeding access to finance from LFIs for PPP infrastructure projects in Nigeria and will be useful for debt providers and policymakers in evaluating the bankability of PPP infrastructure projects in Nigeria and other developing countries.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2020-10-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/JFMPC-10-2019-0078","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-10-2019-0078","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 6

Abstract

Purpose This study explores the challenges of access to finance from local financial institutions (LFIs), i.e. local banks, for public–private partnership (PPP) infrastructure project delivery in Nigeria. The aim is to provide useful insights that could inform policy solutions to ease the local funding of PPP infrastructure projects in Nigeria and, by extension, other developing economies. Design/methodology/approach Adopting a qualitative research methodology, the study engaged PPP stakeholders involved in securing funds for PPP infrastructure projects in Nigeria. A total of 15 PPP stakeholders, drawn from the public and private sectors, were purposively selected and their views on the research problem obtained through recorded telephone interviews. The opinions of the research participants were subsequently analyzed and the results discussed with the outcome of the examination of relevant literature. Findings The study found that the significant factors affecting access to local finance for PPP infrastructure projects in Nigeria include low capital base by LFIs, weak project viability, lack of capacity to manage PPP-related activities, inconsistent government policy, poor legal framework and public perception of PPP. Research limitations/implications Insights from this study are useful for PPP stakeholders in mitigating the barriers that influence access to local finance for PPP infrastructure projects in Nigeria and other developing economies. This study is also useful in enhancing the current policy structure in developing countries as a way of revamping the existing infrastructure framework through LFIs. Originality/value This study provides clarity on the peculiar challenges impeding access to finance from LFIs for PPP infrastructure projects in Nigeria and will be useful for debt providers and policymakers in evaluating the bankability of PPP infrastructure projects in Nigeria and other developing countries.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
尼日利亚PPP基础设施项目交付获得地方融资的挑战
目的本研究探讨了从当地金融机构(LFI)(即当地银行)获得资金,用于尼日利亚公私合作(PPP)基础设施项目交付的挑战。其目的是提供有用的见解,为缓解尼日利亚以及其他发展中经济体PPP基础设施项目的当地资金提供政策解决方案。设计/方法/方法采用定性研究方法,该研究让参与尼日利亚PPP基础设施项目资金保障的PPP利益相关者参与其中。共有15名PPP利益相关者,他们来自公共和私营部门,通过电话采访记录获得了他们对研究问题的看法。随后对研究参与者的意见进行了分析,并将结果与相关文献的审查结果进行了讨论。研究发现,影响尼日利亚PPP基础设施项目获得地方融资的重要因素包括LFI的资本基础低、项目可行性弱、缺乏管理PPP相关活动的能力、政府政策不一致、,糟糕的法律框架和公众对PPP的看法。研究局限性/含义本研究的见解有助于PPP利益相关者缓解影响尼日利亚和其他发展中经济体PPP基础设施项目获得当地资金的障碍。这项研究也有助于加强发展中国家当前的政策结构,作为通过LFI修改现有基础设施框架的一种方式。原始性/价值这项研究明确了阻碍尼日利亚PPP基础设施项目从LFI获得资金的特殊挑战,并将有助于债务提供者和决策者评估尼日利亚和其他发展中国家PPP基础设施项目的银行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1