D. Owusu-Manu, E. Amo-Asamoah, F. A. Ghansah, George Asumadu
{"title":"An analysis of the economic viability of waste-to-energy generation in the Kumasi metropolis of Ghana","authors":"D. Owusu-Manu, E. Amo-Asamoah, F. A. Ghansah, George Asumadu","doi":"10.1108/JFMPC-12-2019-0089","DOIUrl":null,"url":null,"abstract":"Purpose Kumasi Metropolis, the second-largest city in Ghana is known to be bewildered with challenges relating to waste management. As a means of solving the waste management challenge, several suggestions are often made for the establishment of a waste-to-energy plant to manage the disposal of waste and generation of income. There have been no studies conducted to determine how economically viable such plants will be. This study aims to examine the economic viability of waste-to-energy generation in the Kumasi Metropolis to find out how economically viable such an approach will be. Design/methodology/approach To achieve this, a simple debt-equity ratio business model based on discounted cash flow technique was applied to estimate the internal rate of returns (IRR) as a measure of the economic viability and profitability of a modelled 50 MWH waste-energy generation plant in the Kumasi Metropolis. The analysis was performed using the RetScreen Expert Software. Findings The results show that the IRR and benefits cost ratio of the facility were 36% and 5.8%, respectively, indicating high levels of profitability and economic viability. The study concludes that waste-to-energy generation will be an economically viable venture in the Kumasi Metropolis. Practical implications It is, however, important for users of the findings of this study to take caution of the fact that the various assumptions although based on current knowledge and expert opinion may vary with time; therefore, the sensitive analysis on price and costs should always be considered. Practically, this study will contribute to solving the waste management situation in most cities, as well as generating revenue and helping close the energy deficit most developing countries are grabbling with. Originality/value The unique contribution of the study to knowledge is that it has professed an alternative analytical and methodological approach to measuring the financial viability of waste-to-energy plants in situations where there is none in the geographical jurisdiction of the proposed project.","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-12-2019-0089","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1
Abstract
Purpose Kumasi Metropolis, the second-largest city in Ghana is known to be bewildered with challenges relating to waste management. As a means of solving the waste management challenge, several suggestions are often made for the establishment of a waste-to-energy plant to manage the disposal of waste and generation of income. There have been no studies conducted to determine how economically viable such plants will be. This study aims to examine the economic viability of waste-to-energy generation in the Kumasi Metropolis to find out how economically viable such an approach will be. Design/methodology/approach To achieve this, a simple debt-equity ratio business model based on discounted cash flow technique was applied to estimate the internal rate of returns (IRR) as a measure of the economic viability and profitability of a modelled 50 MWH waste-energy generation plant in the Kumasi Metropolis. The analysis was performed using the RetScreen Expert Software. Findings The results show that the IRR and benefits cost ratio of the facility were 36% and 5.8%, respectively, indicating high levels of profitability and economic viability. The study concludes that waste-to-energy generation will be an economically viable venture in the Kumasi Metropolis. Practical implications It is, however, important for users of the findings of this study to take caution of the fact that the various assumptions although based on current knowledge and expert opinion may vary with time; therefore, the sensitive analysis on price and costs should always be considered. Practically, this study will contribute to solving the waste management situation in most cities, as well as generating revenue and helping close the energy deficit most developing countries are grabbling with. Originality/value The unique contribution of the study to knowledge is that it has professed an alternative analytical and methodological approach to measuring the financial viability of waste-to-energy plants in situations where there is none in the geographical jurisdiction of the proposed project.