An analysis of the economic viability of waste-to-energy generation in the Kumasi metropolis of Ghana

D. Owusu-Manu, E. Amo-Asamoah, F. A. Ghansah, George Asumadu
{"title":"An analysis of the economic viability of waste-to-energy generation in the Kumasi metropolis of Ghana","authors":"D. Owusu-Manu, E. Amo-Asamoah, F. A. Ghansah, George Asumadu","doi":"10.1108/JFMPC-12-2019-0089","DOIUrl":null,"url":null,"abstract":"Purpose Kumasi Metropolis, the second-largest city in Ghana is known to be bewildered with challenges relating to waste management. As a means of solving the waste management challenge, several suggestions are often made for the establishment of a waste-to-energy plant to manage the disposal of waste and generation of income. There have been no studies conducted to determine how economically viable such plants will be. This study aims to examine the economic viability of waste-to-energy generation in the Kumasi Metropolis to find out how economically viable such an approach will be. Design/methodology/approach To achieve this, a simple debt-equity ratio business model based on discounted cash flow technique was applied to estimate the internal rate of returns (IRR) as a measure of the economic viability and profitability of a modelled 50 MWH waste-energy generation plant in the Kumasi Metropolis. The analysis was performed using the RetScreen Expert Software. Findings The results show that the IRR and benefits cost ratio of the facility were 36% and 5.8%, respectively, indicating high levels of profitability and economic viability. The study concludes that waste-to-energy generation will be an economically viable venture in the Kumasi Metropolis. Practical implications It is, however, important for users of the findings of this study to take caution of the fact that the various assumptions although based on current knowledge and expert opinion may vary with time; therefore, the sensitive analysis on price and costs should always be considered. Practically, this study will contribute to solving the waste management situation in most cities, as well as generating revenue and helping close the energy deficit most developing countries are grabbling with. Originality/value The unique contribution of the study to knowledge is that it has professed an alternative analytical and methodological approach to measuring the financial viability of waste-to-energy plants in situations where there is none in the geographical jurisdiction of the proposed project.","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-12-2019-0089","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

Abstract

Purpose Kumasi Metropolis, the second-largest city in Ghana is known to be bewildered with challenges relating to waste management. As a means of solving the waste management challenge, several suggestions are often made for the establishment of a waste-to-energy plant to manage the disposal of waste and generation of income. There have been no studies conducted to determine how economically viable such plants will be. This study aims to examine the economic viability of waste-to-energy generation in the Kumasi Metropolis to find out how economically viable such an approach will be. Design/methodology/approach To achieve this, a simple debt-equity ratio business model based on discounted cash flow technique was applied to estimate the internal rate of returns (IRR) as a measure of the economic viability and profitability of a modelled 50 MWH waste-energy generation plant in the Kumasi Metropolis. The analysis was performed using the RetScreen Expert Software. Findings The results show that the IRR and benefits cost ratio of the facility were 36% and 5.8%, respectively, indicating high levels of profitability and economic viability. The study concludes that waste-to-energy generation will be an economically viable venture in the Kumasi Metropolis. Practical implications It is, however, important for users of the findings of this study to take caution of the fact that the various assumptions although based on current knowledge and expert opinion may vary with time; therefore, the sensitive analysis on price and costs should always be considered. Practically, this study will contribute to solving the waste management situation in most cities, as well as generating revenue and helping close the energy deficit most developing countries are grabbling with. Originality/value The unique contribution of the study to knowledge is that it has professed an alternative analytical and methodological approach to measuring the financial viability of waste-to-energy plants in situations where there is none in the geographical jurisdiction of the proposed project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
加纳库马西大都市垃圾焚烧发电的经济可行性分析
众所周知,加纳第二大城市库马西大都会对废物管理方面的挑战感到困惑。作为解决废物管理挑战的一种手段,通常会对建立废物发电厂以管理废物处置和创收提出一些建议。目前还没有进行任何研究来确定这些工厂在经济上的可行性。本研究旨在检查库马西大都市垃圾焚烧发电的经济可行性,以了解这种方法在经济上有多可行。设计/方法/方法为了实现这一点,应用基于贴现现金流技术的简单债务权益比商业模型来估计内部收益率(IRR),作为库马西大都市建模的50MWh废物能源发电厂的经济可行性和盈利能力的衡量标准。使用RetScreen Expert软件进行分析。结果显示,该设施的内部收益率和效益成本比分别为36%和5.8%,表明其具有较高的盈利能力和经济可行性。该研究得出的结论是,在库马西大都会,垃圾发电在经济上是可行的。实际意义。然而,对于本研究结果的使用者来说,重要的是要注意,尽管基于当前知识和专家意见,但各种假设可能会随时间而变化;因此,应始终考虑对价格和成本的敏感分析。实际上,这项研究将有助于解决大多数城市的废物管理问题,并创造收入,帮助解决大多数发展中国家正在努力解决的能源短缺问题。独创性/价值该研究对知识的独特贡献在于,它提出了一种替代分析和方法论方法,用于在拟议项目的地理管辖范围内没有废物发电厂的情况下衡量废物发电厂财务可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1