Waste analysis of tapioca unloading process with lean supply chain approach in Makassar Port

IF 0.8 Q4 ENGINEERING, INDUSTRIAL Acta Logistica Pub Date : 2023-03-31 DOI:10.22306/al.v10i1.353
S. Suradi, Dirgahayu Lantara, Ahmad Padhil
{"title":"Waste analysis of tapioca unloading process with lean supply chain approach in Makassar Port","authors":"S. Suradi, Dirgahayu Lantara, Ahmad Padhil","doi":"10.22306/al.v10i1.353","DOIUrl":null,"url":null,"abstract":"In the process of dismantling tapioca flour, waste occurs due to activities that do not provide added value (Non-Value Added). The purpose of this study is to identify and analyze the types of waste and then propose improvements to eliminate activities that do not provide added value. By using the concept of lean supply chain and value stream mapping (VSM) it is expected to eliminate activities that do not provide added value and make the company more productive. Through the analysis of seven wastes and fishbone diagrams, it is known that the biggest causes of waste are waiting for the arrival of workers, waiting for pilot/tug boats, waiting for trucks to arrive, and working on sacks that have fallen and torn. Meanwhile, the recommendations given are to coordinate and evaluate the performance of workers, increase the number of pilot/tug boats and trucks, and supervise the unloading process to minimize mistakes made by workers. With the proposed improvement, the cycle time, which was originally 335.34 minutes decreased to 271.97 minutes, and for Process Cycle Efficiency (PCE) which was originally 68.30% increased to 84.22%.","PeriodicalId":36880,"journal":{"name":"Acta Logistica","volume":" ","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2023-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Logistica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22306/al.v10i1.353","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

In the process of dismantling tapioca flour, waste occurs due to activities that do not provide added value (Non-Value Added). The purpose of this study is to identify and analyze the types of waste and then propose improvements to eliminate activities that do not provide added value. By using the concept of lean supply chain and value stream mapping (VSM) it is expected to eliminate activities that do not provide added value and make the company more productive. Through the analysis of seven wastes and fishbone diagrams, it is known that the biggest causes of waste are waiting for the arrival of workers, waiting for pilot/tug boats, waiting for trucks to arrive, and working on sacks that have fallen and torn. Meanwhile, the recommendations given are to coordinate and evaluate the performance of workers, increase the number of pilot/tug boats and trucks, and supervise the unloading process to minimize mistakes made by workers. With the proposed improvement, the cycle time, which was originally 335.34 minutes decreased to 271.97 minutes, and for Process Cycle Efficiency (PCE) which was originally 68.30% increased to 84.22%.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于精益供应链的望加锡港木薯卸载过程废弃物分析
在木薯粉的拆解过程中,由于不提供附加值(非附加值)的活动而产生废物。本研究的目的是识别和分析废物的类型,然后提出改进措施,以消除不能提供附加值的活动。通过使用精益供应链和价值流映射(VSM)的概念,有望消除不能提供附加值的活动,提高公司的生产力。通过对七种废物和鱼骨图的分析,可以知道,造成废物的最大原因是等待工人的到来、等待引航员/拖船、等待卡车的到来以及处理掉落和撕裂的麻袋。同时,提出的建议是协调和评估工人的表现,增加引航员/拖船和卡车的数量,并监督卸货过程,以尽量减少工人的错误。通过所提出的改进,循环时间从最初的335.34分钟减少到271.97分钟,工艺循环效率(PCE)从最初的68.30%增加到84.22%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Acta Logistica
Acta Logistica Engineering-Industrial and Manufacturing Engineering
CiteScore
1.80
自引率
28.60%
发文量
36
审稿时长
4 weeks
期刊最新文献
Simulation of operations on the production line as a tool for making the production process more efficient The disruptive times of Covid-19: higher education leadership and management logistics in Arab nations Streamlining logistics flows with lean tools using TX Plant Simulation software support Improving allocation and layout in production logistics Assessing the Bullwhip effect in supply chain: trends, gaps, and overlaps
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1