A Fuzzy Decision-Making Framework for Route Selection in Multimodal Transportation Networks

IF 1.9 4区 管理学 Q3 ENGINEERING, INDUSTRIAL Engineering Management Journal Pub Date : 2022-02-17 DOI:10.1080/10429247.2022.2027205
Nitidetch Koohathongsumrit, W. Meethom
{"title":"A Fuzzy Decision-Making Framework for Route Selection in Multimodal Transportation Networks","authors":"Nitidetch Koohathongsumrit, W. Meethom","doi":"10.1080/10429247.2022.2027205","DOIUrl":null,"url":null,"abstract":"Abstract This study presents a novel decision-making framework for route selection in multimodal transportation networks under fuzzy environments. The proposed framework integrates the fuzzy group decision-making technique, the fuzzy deliberate process, and fuzzy multiple criteria decision-making approaches. Hence, the fuzzy Delphi method, fuzzy risk assessment, the fuzzy analytic hierarchy process, and the fuzzy technique for order of preference by similarity to ideal solution are first combined to select the most appropriate multimodal route. An empirical study demonstrates that the proposed framework is an outstanding and systematic decision support tool to aid decision makers in transportation decision-making processes of freight route selections.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"34 1","pages":"689 - 704"},"PeriodicalIF":1.9000,"publicationDate":"2022-02-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/10429247.2022.2027205","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 5

Abstract

Abstract This study presents a novel decision-making framework for route selection in multimodal transportation networks under fuzzy environments. The proposed framework integrates the fuzzy group decision-making technique, the fuzzy deliberate process, and fuzzy multiple criteria decision-making approaches. Hence, the fuzzy Delphi method, fuzzy risk assessment, the fuzzy analytic hierarchy process, and the fuzzy technique for order of preference by similarity to ideal solution are first combined to select the most appropriate multimodal route. An empirical study demonstrates that the proposed framework is an outstanding and systematic decision support tool to aid decision makers in transportation decision-making processes of freight route selections.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
多式联运网络路径选择的模糊决策框架
摘要本研究提出了一种新的模糊环境下多式联运网络路线选择决策框架。该框架集成了模糊群决策技术、模糊深思熟虑过程和模糊多准则决策方法。因此,首先将模糊德尔菲法、模糊风险评估、模糊层次分析法和与理想解相似的偏好排序模糊技术相结合,选择最合适的多式联运路线。实证研究表明,所提出的框架是一个出色的系统决策支持工具,可以帮助决策者在货运路线选择的运输决策过程中进行决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Engineering Management Journal
Engineering Management Journal 工程技术-工程:工业
CiteScore
5.60
自引率
12.00%
发文量
27
审稿时长
>12 weeks
期刊介绍: EMJ is designed to provide practical, pertinent knowledge on the management of technology, technical professionals, and technical organizations. EMJ strives to provide value to the practice of engineering management and engineering managers. EMJ is an archival journal that facilitates both practitioners and university faculty in publishing useful articles. The primary focus is on articles that improve the practice of engineering management. To support the practice of engineering management, EMJ publishes papers within key engineering management content areas. EMJ Editors will continue to refine these areas to ensure they are aligned with the challenges faced by technical organizations and technical managers.
期刊最新文献
Lean Office: Proposition and Application of a Process-Mapping Method Based on the Shingo Production Mechanism (SPM) Managing Stakeholder Pressure for Megaproject Success and Green Innovation: The Key Role of Social Responsibility Engineering Management Education: Washington Accord Accreditation Programs The New PAD: A Method to Implement the Lean Construction Principles A Risk Minimization Model for a Multi-Skilled, Multi-Mode Resource-Constrained Project Scheduling Problem with Discrete Time-Cost-Quality-Risk Trade-Off
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1