Efficient utilisation of automation in construction materials-handling processes

IF 0.6 Q4 MANAGEMENT Acta Structilia Pub Date : 2022-11-30 DOI:10.18820/24150487/as29i2.2
P. Alumbugu, W. Shakantu, A. Tsado, W. Ola-awo
{"title":"Efficient utilisation of automation in construction materials-handling processes","authors":"P. Alumbugu, W. Shakantu, A. Tsado, W. Ola-awo","doi":"10.18820/24150487/as29i2.2","DOIUrl":null,"url":null,"abstract":"There is a limited understanding of automation in construction materials-handling processes utilised by manufacturing firms in Nigeria. This article evaluates the level of utilisation of automation in construction materials-handling operations by manufacturing firms in North-Central Nigeria, to improve operational efficiency and reduce operating costs. Using a case study research design, quantitative data (observation guide with measurements) were collected from 32 purposively selected construction-material manufacturers. A total of 72 customers’ orders were observed and recorded to be representative of deliveries from the sampled (n=32) manufacturers’ warehouses to other terminals. The descriptive method of data analysis was employed using percentages and results presented in a form of bar charts. The study reveals low-level utilisation of automation in the combined processes of order picking, storage, loading, and offloading of material. These imply increasing material costs and causing a delay in delivery. The article concludes by providing construction-material manufacturers with areas that require automation to optimise material-handling operations. A recommendation is made for further study to explore why automation is not utilised despite its advantage.  ","PeriodicalId":42571,"journal":{"name":"Acta Structilia","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Structilia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18820/24150487/as29i2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

There is a limited understanding of automation in construction materials-handling processes utilised by manufacturing firms in Nigeria. This article evaluates the level of utilisation of automation in construction materials-handling operations by manufacturing firms in North-Central Nigeria, to improve operational efficiency and reduce operating costs. Using a case study research design, quantitative data (observation guide with measurements) were collected from 32 purposively selected construction-material manufacturers. A total of 72 customers’ orders were observed and recorded to be representative of deliveries from the sampled (n=32) manufacturers’ warehouses to other terminals. The descriptive method of data analysis was employed using percentages and results presented in a form of bar charts. The study reveals low-level utilisation of automation in the combined processes of order picking, storage, loading, and offloading of material. These imply increasing material costs and causing a delay in delivery. The article concludes by providing construction-material manufacturers with areas that require automation to optimise material-handling operations. A recommendation is made for further study to explore why automation is not utilised despite its advantage.  
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
高效利用建筑材料处理过程中的自动化
尼日利亚制造公司对建筑材料处理过程自动化的了解有限。本文评估了尼日利亚中北部制造公司在建筑材料搬运操作中的自动化利用水平,以提高运营效率并降低运营成本。采用案例研究设计,从32家有目的选择的建筑材料制造商那里收集了定量数据(带测量的观察指南)。共观察并记录了72个客户的订单,这些订单代表了从抽样(n=32)制造商仓库到其他码头的交货情况。采用数据分析的描述性方法,使用条形图形式显示的百分比和结果。该研究揭示了在材料的订单挑选、储存、装载和卸载的组合过程中,自动化的利用率很低。这意味着材料成本增加,并导致交货延迟。文章最后为建筑材料制造商提供了需要自动化的领域,以优化材料处理操作。建议进行进一步研究,以探索为什么尽管自动化具有优势,但它没有得到利用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Acta Structilia
Acta Structilia MANAGEMENT-
自引率
14.30%
发文量
0
审稿时长
18 weeks
期刊最新文献
Optimisation of labour-intensive productivity for construction projects in Ghana Labour productivity in construction SMEs: Perspectives from South Africa Predictors of corruption among town planners: A Nigerian case study Impact of urban renewal changes on urban landscape identity: Case study of Kisumu City, Kenya A conceptual quality improvement protocol for Free State public works projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1