{"title":"Maintaining our Dams and Contributing Towards Net Zero","authors":"M. Jack","doi":"10.1680/jdare.22.00098","DOIUrl":null,"url":null,"abstract":"Loch Mhòr in Scotland is the upper reservoir of the Foyers pumped storage hydro-electric scheme. The reservoir has operated below its storage capacity for some time. A project was initiated to develop options to increase the storage capacity and remove existing restrictions on the scheme due to leakage and seepage experienced at the main spillweir. The project evolved to include satisfying a Measure to be taken in the Interests Of Safety (MIOS) associated with the spillweir, which was issued under the Reservoirs (Scotland) Act 2011 (HMG, 2011) – hereinafter referred to as the Act. As a nation the effort and work to achieve Net Zero is progressing. In the case of Loch Mhòr, the impact of the project on a national scale is small; however, it remains a step forward in achieving the Net Zero goal.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Loch Mhòr in Scotland is the upper reservoir of the Foyers pumped storage hydro-electric scheme. The reservoir has operated below its storage capacity for some time. A project was initiated to develop options to increase the storage capacity and remove existing restrictions on the scheme due to leakage and seepage experienced at the main spillweir. The project evolved to include satisfying a Measure to be taken in the Interests Of Safety (MIOS) associated with the spillweir, which was issued under the Reservoirs (Scotland) Act 2011 (HMG, 2011) – hereinafter referred to as the Act. As a nation the effort and work to achieve Net Zero is progressing. In the case of Loch Mhòr, the impact of the project on a national scale is small; however, it remains a step forward in achieving the Net Zero goal.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
维护我们的水坝并为实现净零做出贡献
苏格兰的Mhår湖是Foyers抽水蓄能水电项目的上游水库。水库在低于蓄水量的情况下运行了一段时间。启动了一个项目,以开发增加蓄水量的方案,并消除由于主溢流堰发生泄漏和渗漏而对该方案的现有限制。该项目的发展包括满足根据《2011年水库(苏格兰)法》(HMG,2011)(以下简称《法案》)发布的与溢流堰相关的安全措施(MIOS)。作为一个国家,实现净零排放的努力和工作正在取得进展。就Mhår湖而言,该项目在全国范围内的影响很小;然而,它在实现净零排放目标方面仍然向前迈出了一步。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
期刊最新文献
Leeds FAS2 FSR: environmental challenges for the design of an in-river control structure Simulating a reservoir on-site flood plan test: Operation Redbrook Dunside reservoirs discontinuance – taking a new approach Undertaking RARS assessments for Hong Kong reservoirs Assessment the stability of earth dams based on construction pace by fuzzy inference logic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1