Applying a Technical-Economic Approach to Calculate a Suitable Panel Width for Longwall Mining Method

IF 1.1 Q3 MINING & MINERAL PROCESSING Journal of Mining and Environment Pub Date : 2021-01-01 DOI:10.22044/JME.2020.9552.1870
S. Aghababaei, H. Jalalifar, A. Hosseini
{"title":"Applying a Technical-Economic Approach to Calculate a Suitable Panel Width for Longwall Mining Method","authors":"S. Aghababaei, H. Jalalifar, A. Hosseini","doi":"10.22044/JME.2020.9552.1870","DOIUrl":null,"url":null,"abstract":"Providing an approach to calculate a suitable panel width for the longwall mining method is considered considering both the technical and economic factors. Based on the investigations carried out, a technical-economic model is proposed to calculate a suitable panel width. The proposed model is a combination of the rock engineering system-based model and the technical relationships to estimate the expected actual face advance rate of the longwall panel and also the economic relationships to determine the operational costs. Applying the technical conditions to the presented model is conducted by the vulnerability index of the advancing operation, which considers the face advance rate as the main important factor that controls the operational costs of the longwall face. The performance evaluation of the presented model is possible by the recordable field data, which is one of its advantages. This process is carried out by a case study, and the results obtained indicate that the developed approach can provide an applicable tool to calculate a suitable panel width.","PeriodicalId":45259,"journal":{"name":"Journal of Mining and Environment","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22044/JME.2020.9552.1870","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 2

Abstract

Providing an approach to calculate a suitable panel width for the longwall mining method is considered considering both the technical and economic factors. Based on the investigations carried out, a technical-economic model is proposed to calculate a suitable panel width. The proposed model is a combination of the rock engineering system-based model and the technical relationships to estimate the expected actual face advance rate of the longwall panel and also the economic relationships to determine the operational costs. Applying the technical conditions to the presented model is conducted by the vulnerability index of the advancing operation, which considers the face advance rate as the main important factor that controls the operational costs of the longwall face. The performance evaluation of the presented model is possible by the recordable field data, which is one of its advantages. This process is carried out by a case study, and the results obtained indicate that the developed approach can provide an applicable tool to calculate a suitable panel width.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
应用技术经济方法计算长壁采矿法适宜盘面宽度
从技术和经济两方面考虑,为长壁采矿法提供一种合适的底板宽度计算方法。在此基础上,提出了一个技术经济模型来计算合适的面板宽度。该模型结合了基于岩石工程系统的模型和预测长壁板实际掘进速度的技术关系,以及确定作业成本的经济关系。将该模型的技术条件应用于超前作业脆弱性指标,将工作面超前速度作为控制长壁工作面作业成本的主要重要因素。该模型的优点之一是可以利用可记录的现场数据对模型进行性能评价。通过实例分析,结果表明该方法可以为计算合适的面板宽度提供一种实用的工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Mining and Environment
Journal of Mining and Environment MINING & MINERAL PROCESSING-
CiteScore
1.90
自引率
25.00%
发文量
0
期刊最新文献
Fe3O4@TiO2@V2O5 as an efficient magnetic nanoparticle for synthesis of di-indolyl oxindole derivatives Propose a viable stabilization method for slope in weak rock mass environment using numerical modelling: A case study from the cut slopes Estimation of optimum geometric configuration of mine dumps in Wardha valley coalfields in India: a case study An investigation on tailing slurry transport in Kooshk lead-zinc mine in Iran based on non-Newtonian fluid rheology: an experimental study Carnallite Flotation of Khur Biabanak Potash Complex using kimiaflot 619 as a New Collector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1