A. Sampaio, Nuno R. Gomes, A. Gomes, A. Sánchez-Lite
{"title":"Multi-Project in an Integrated BIM Model: Clash Detection and Construction Planning","authors":"A. Sampaio, Nuno R. Gomes, A. Gomes, A. Sánchez-Lite","doi":"10.4236/jsea.2022.1510020","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":62222,"journal":{"name":"软件工程与应用(英文)","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"软件工程与应用(英文)","FirstCategoryId":"1093","ListUrlMain":"https://doi.org/10.4236/jsea.2022.1510020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}